3.5 Connecting the vent and air intake pipes
The appliance offers 3" connections that accept standard 3" PVC/CPVC and PP pipe. Use reducing
fittings (not bushings) to adapt to smaller diameter pipe. Insert pipe directly into the 3" female fitting,
and secure with the built-in clamp (see image below). For PP, no transition adapter is required. The
vent connection has a second gasket approximately 2.5” below the first 3” PVC/CPVC sized gasket
that will seal to standard 80 mm PP pipe. Care should be taken to ensure that PP pipe is installed so
that it extends past this second gasket.
For PP material exposed to outdoor conditions, follow the venting supplier’s recommendations on
UV protection.
Figure 6
Securing a pipe connection
Combustion air piping - if used - is inserted directly into the 3" connector on the right side. PP pipe
should be inserted firmly into the connector until it cannot go further. The pipe must be secured with
the built-in clamp.
Warning
Ensure that you lubricate the gasket with silicone grease before inserting the venting
material. Fully insert the approved venting material into the boiler's exhaust outlet, and
tighten clamp to ensure the venting connection is locked in place (as shown above).
Venting must be supported in accordance with the applicable code and instructions supplied by the
manufacturers.
Warning
Do not mix PP venting materials from different manufacturers. These venting materials
are designed to be installed as part of a complete system. Failure to comply may result in
severe personal injury or death.
23
3.5 Connecting the vent and air intake pipes
Содержание CX Series
Страница 6: ...Boiler part diagrams CX 150 CX 199 118 Installation Commissioning Report 122 6 Section Contents...
Страница 10: ...Intentionally left empty...
Страница 13: ...Figure 2 Top and bottom view CX 150 CX 199 dimensions Figure 3 Front and side view CX 199 13 CX 199 dimensions...
Страница 70: ...Intentionally left empty...
Страница 84: ...Intentionally left empty...
Страница 102: ...Intentionally left empty...
Страница 114: ...Appendices Wiring diagrams Figure 48 Controller electrical diagram 114 Section Troubleshooting...
Страница 115: ...Figure 49 Internal wiring diagram 115 Wiring diagrams...
Страница 116: ...Figure 50 Sequence of Operation 116 Section Troubleshooting...
Страница 117: ...8 4 Exploded views of the CX 150 CX 199 appliance 117 8 4 Exploded views of the CX 150 CX 199 appliance...
Страница 119: ...119 Boiler part diagrams CX 150 CX 199...