
59
4.0 Service and maintenance
The IBC air handling appliance is designed for durability and easy access to the main components:
control board, fan assembly, hot water coil assembly, and filter. Over time, components such as
sensors may require replacing and servicing. Note that failure to use the correct procedures or parts
could result in unsafe operation.
4.1 Maintenance checklist for owners
Owners should arrange follow-up inspections and simple maintenance procedures according to IBC's
suggested servicing guidelines below.
Maintenance Required
Frequency
Check
Check and replace filter as needed. Replace the filter monthly.
Inspect system for unusual noises. Call your local heating contractor
for service if needed
Monthly
□
Have your local heating contractor inspect the system annually.
This service should include the heat appliance connected to the Air
Handling appliance.
Annually
□
4.2 Maintenance for the heating contractor
4.2.1 Removing the fan assembly
1.
Remove the two screws from the front
cover, and set aside.
2.
Remove the two bolts from the fan
assembly plate.
Содержание AHU Series
Страница 1: ...INSTALLATION OPERATING MANUAL Air Handling appliances AHU 800 AHU1200 AHU 1600...
Страница 2: ......
Страница 5: ...5 3 Fault Codes 67 Air handling appliance parts diagram 70 3...
Страница 6: ...This page is intentionally left blank...
Страница 18: ...This page is intentionally left blank...
Страница 60: ...This page is intentionally left blank...
Страница 68: ...This page is intentionally left blank...