16
Version 20.01, 20-July-2020
8. System installation AeroFix
Before constructing the PV system the roof must be cleared of dirt, snow and ice.
Base rails
The assembly of the base rail G2 and G2 Eco is idendical.
Measure roof and mark out edge and corner areas
Install base rails with integrated building protection mat
Fig. 13 Roof preperation
Fig. 14 Installation base rails
Содержание AeroFix 10-EW
Страница 1: ...1 Installation instructions IBC AeroFix AeroFlat Version 20 01 Date 20 July 2020...
Страница 9: ...9 Version 20 01 20 July 2020 4 2 AeroFlat Parallel to the roof Fig 6 AeroFlat...
Страница 17: ...17 Version 20 01 20 July 2020 Fig 15 Installation base rails Fig 16 Installation base rails...
Страница 41: ...41 Version 20 01 20 July 2020 Fig 59 Wind plate assembly starting from the left Fig 60 Insert wind plate...
Страница 42: ...42 Version 20 01 20 July 2020 Fig 61 Wind plate assembly Fig 62 Fixation wind plate...
Страница 43: ...43 Version 20 01 20 July 2020 Cable clip assembly Fig 64 assembly cable clip 90 Fig 63 assembly cable clip 0...
Страница 52: ...52 Version 20 01 20 July 2020 Fig 79 After two modules keep a distance of 250 mm Fig 80 Mounted module field...
Страница 53: ...53 Version 20 01 20 July 2020 Fig 81 Schematic system dimensions...
Страница 68: ...68 Version 20 01 20 July 2020...
Страница 71: ...71 Version 20 01 20 July 2020 13 4 Checklist IBC AeroFix...
Страница 72: ...72 Version 20 01 20 July 2020...
Страница 73: ...73 Version 20 01 20 July 2020 14 Notes...