Operation 3-1
ADVICE FOR OPERATION OF
NEW LOADER
All loaders were checked and adjusted before delivery from
the factory. However, during the initial running-in process,
you should still obey the following procedures, otherwise the
equipment could be damaged or its performance degraded.
If perform the operation with full load before running-in period,
it will produce adverse effect on the operation life and safety
running, and cause accidents finally.
Operation
Note:
1) Check coolant, fuel, oil and hydraulic oil
for leakage each day.
2) Check lubrication oil every day and replace it if
necessary.
3) Frequently watch the displays on dashboard and
various instruments during operation.
4) Avoid the overload of engine.
5) Keep a load of 80% before engine and other
components reaching their operating temperatures.
6) Pay attention during operation whether the working
device is working normally
7) Check for the component loose or damage due to
transportation.
8) Check the electric wires or terminals for not loose, the
instrument for normal operation, and electrolytes for
sufficiency.
9) Check Tire air pressure for normality.
Содержание HL630VL
Страница 1: ......
Страница 3: ......
Страница 5: ......
Страница 7: ......
Страница 51: ......
Страница 61: ...2 10 Operation Controls Schematic Fig 11 ...
Страница 119: ......
Страница 126: ...Inspection Maintenance and Adjustment 4 7 LUBRICATION OIL AND MAINTENANCE CHART Figure 4 ...
Страница 161: ......