Inspection, Maintenance and Adjustment 4-19
4. Remove the wheel nuts and tire assy from the hub (refer to
Fig 17). Check the wearness of nut and replace the nut if
necessary.
5. Check all components for excessive wear, and replace
them if necessary.
6. When you tighten the wheel nuts, refer to the pattern
shown in Fig.18. Tighten the nuts to the specified torque
(tightening torque: 600-650N.m and coat tightening glue on
the mounting bolts)
7. Rotate the wheels forward and backward, drive the
machine to ensure the correct installation of the Tires.
Re-tighten the Tire nuts with the required torque
Fig 17
Fig 18
Fig 19
Содержание HL630VL
Страница 1: ......
Страница 3: ......
Страница 5: ......
Страница 7: ......
Страница 51: ......
Страница 61: ...2 10 Operation Controls Schematic Fig 11 ...
Страница 119: ......
Страница 126: ...Inspection Maintenance and Adjustment 4 7 LUBRICATION OIL AND MAINTENANCE CHART Figure 4 ...
Страница 161: ......