Forks
Lower the fork carriage until the forks are
approximately 25mm (1in) from the floor.
Turn knob up and slide one fork at a time
toward the center of the carriage where a
notch has been cut in the bottom plate for
easy removal.
Remove only one fork at a time.
On larger forks it may be necessary to
use a block of wood.
2-2
GROUP 2 REMOVAL AND INSTALLATION OF UNIT
1. MAST
REMOVAL
1)
(1)
Remove and install following units as explained in the flow chart.
Backrest
Knob
Carriage
Center notch
Fork
Pin
Spring
Backrest (If necessary)
Remove bolts securing backrest to fork
carriage. Lift backrest straight up and
remove it from carriage.
(2)
Backrest
Bolt
Carriage
20D7RE02
20D7RE03
C
Carriage
With the mast vertical, raise the carriage
high enough to place blocks under the
load forks. This is done to create slack in
the load chains when the carriage is
lowered. Lower the carriage all the way
down to the floor. Make sure the carriage
is level, this will prevent any binding when
the mast is raised.
(3)
20L7RE04
Содержание 20G-7
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 6: ......
Страница 17: ...SECTION 1 GENERAL Group 1 Safety hints 1 1 Group 2 Specifications 1 5 Group 3 Periodic replacement 1 14 ...
Страница 33: ...SECTION 2 REMOVAL AND INSTALLATION OF UNIT Group 1 Structure 2 1 Group 2 Removal and Installation of Unit 2 2 ...
Страница 41: ...2 7 Mast Refer to the chapter 1 MAST Page 2 2 1 2 POWER TRAIN ASSEMBLY REMOVAL 1 D503RE04 ...
Страница 59: ...3 7 OPERATING MODES Forward INPUT OUTPUT 4 1 INPUT OUTPUT 20D7PT29 20D7PT30 Reverse 2 ...
Страница 231: ...7 3 FUEL SYSTEM CIRCUIT TIER 3 LPG 20L7EL07 ...
Страница 232: ...7 4 FUEL SYSTEM CIRCUIT TIER 3 BI FUEL 20L7EL06 ...
Страница 233: ...7 5 FUEL SYSTEM CIRCUIT NON CERT LPG 20L7EL08 ...
Страница 234: ...7 6 FUEL SYSTEM CIRCUIT NON CERT BI FUEL 20L7EL09 ...
Страница 235: ...7 7 MEMORANDUM ...
Страница 267: ...MODEL L4GC SHOP MANUAL FOR INDUSTRIAL USE ...
Страница 270: ...CONTENTS 4 FUELSYSTEM 4 1 3 ENGINEELECTRICALSYSTEM 3 1 2 ENGINE MECHANICAL SYSTEM 2 1 1 GENERAL 1 1 ...
Страница 271: ...1 GENERAL 1 1 2 RECOMMENDEDLUBRICANTSANDCAPACITIES 1 5 3 SCHEDULEDMAINTENANCE 1 6 CHAPTER 1 GENERAL ...
Страница 284: ...GENERAL 2 1 GENERAL OUTLINE L4GC001A ...
Страница 285: ...GENERAL 2 2 L4GC002A ...
Страница 305: ...CYLINDER BLOCK 2 22 INSTALLATION Install the following parts in order 1 Crankshaft 2 Flywheel 3 Piston 4 Cylinder head ...
Страница 311: ...CYLINDER BLOCK 2 28 Oil pan bolt 1 0 1 2kg m 7 Install the oil pan and tighten the bolt to the specified torque ...
Страница 346: ...LUBRICATION SYSTEM 2 63 4 Front case Oil pump 5 Timing belt 6 Timing belt cover ...
Страница 369: ...1 GENERAL 3 1 2 IGNITIONSYSTEM 3 3 3 CHARGINGSYSTEM 3 9 4 STARTINGSYSTEM 3 25 CHAPTER 3 ENGINE ELECTRICAL SYSTEM ...
Страница 390: ...3 21 5 Loosen 4 through bolts L4GC330A L4GC048A 6 Separate the rotor and cover CHARGINGSYSTEM ...
Страница 402: ...1 GENERAL 4 1 2 INJECTOR 4 14 4 PVC VALVE 4 16 CHAPTER 4 FULE SYSTEM AND OTHER ...
Страница 420: ......