4000 SRM 482
Three-Stage Mast Assembly
Figure 20. Hose and Cable Assemblies - Inner and Intermediate Weldments
10. Remove the cylinder strap. Use a crane and sling
to lift the free-lift cylinder off the locating screw
and out of the inner weldment. If the free-lift
cylinder must be disassembled, see the section
Lift Cylinders 4000 SRM 481.
11. Reverse the procedure to install the cylinder.
Make sure the locating screw for the base of the
free-lift cylinder is installed before installing the
cylinder. Use a crane and sling to install the
cylinder on the inner weldment.
12. Adjust the main-lift chains. Check for hydraulic
leaks and correct operation after the cylinder is
installed. See Adjust Main-Lift Chains.
27
Содержание MAST N30XMH
Страница 14: ...Two Stage Mast Assembly 4000 SRM 482 Figure 10 Two Stage Mast Assembly Dual Lift Cylinders 10 ...
Страница 16: ...Two Stage Mast Assembly 4000 SRM 482 Figure 11 Two Stage Mast Assembly Single Lift Cylinder 12 ...
Страница 21: ...4000 SRM 482 Two Stage Mast Assembly Figure 15 Hose and Cable Assemblies Two Stage Mast Dual Lift Cylinders 17 ...
Страница 27: ...4000 SRM 482 Three Stage Mast Assembly Figure 18 Three Stage Mast Assembly 23 ...
Страница 34: ...Three Stage Mast Assembly 4000 SRM 482 Figure 21 Hose and Cable Assemblies Outer Weldment 30 ...
Страница 51: ......
Страница 52: ...TECHNICAL PUBLICATIONS 4000 SRM 482 4 08 11 06 5 04 4 03 5 02 5 98 12 95 4 92 2 92 Printed in U S A ...