44
Powermax125
Service Manual 808070
3 – Basic System Operations
Operating the Powermax
Follow the steps below to begin cutting or gouging with the system.
This section provides basic operating instructions. Before operating your system in a
production environment, refer to
on page 51 or
Connect the electrical power, gas supply, and torch lead
For information on connecting the proper plug to the power cord, refer to
Plug in the power cord and connect the gas supply line. For more information about the electrical requirements and the
gas supply requirements of the Powermax, see
on page 29. To connect the torch, push the
FastConnect connector into the receptacle on the front of the power supply. You will attach the work lead in the next step.
CCC units do not ship with a power cord. To maintain CE certification, install power cord
kit 228886.
Torch lead
Work lead
Power cord (does not
ship with plug)
Gas supply line
Содержание Powermax 125
Страница 1: ...Powermax125 Plasma Arc Cutting System Service Manual 808070 Revision 1 English ...
Страница 3: ...Powermax125 Service Manual 808070 Revision 1 English April 2014 Hypertherm Inc Hanover NH 03755 USA ...
Страница 6: ......
Страница 56: ...56 Powermax125 Service Manual 808070 4 Hand Torch Setup ...