background image

WARNING –

 To prevent electrical shock or equip-

ment damage, power must be off during installation 

or servicing of the control. To prevent serious burns, 

the boiler should be thoroughly cooled before 

installing or servicing control. Only qualified person-

nel may install or service the control in accordance 

with local codes and ordinances. Read instructions 

completely before proceeding.

The probe may be installed in the boiler above the 

lowest safe water level established by the boiler 

manufacturer. Most manufacturers provide a suit-

able opening in the side of the boiler.

Allow 1/4" clearance from the probe to any boiler 

surface, tube or baffle. NOTE: Excessive use of 

Teflon tape to seal probe piping threads may insu-

late the control from boiler ground. This could result 

in the control not operating.

Low Water Cut-Offs 

For Steam Boilers

24 VAC Operating Voltage 

Max. Pressure 15 psi

U.S. Patent Nos. 5,739,504 & 6,390,027

HOW TO INSTALL

1

2

3

5

1/4"

SAFE

WATER

LINE

126 Bailey Road

North Haven, CT 06473

Phone: (203) 776-0473 • FAX: (203) 764-1711

www.hydrolevel.com

Low maintenance. No moving parts to wear stick or hang up,  

as in float devices.
Solid state circuitry. Designed for the highest level of  

performance and reliability.
Automatically shuts off burner, after delay, in a low water  

condition to prevent dry firing.
Time delay allows water to feed above the probe to a safe  

operating level.
INTERMITTENT LEVEL TEST – periodically monitors settled water 

level for added protection of today’s smaller steam boilers.

CG400 Series

with

Loosen the two control cover binding head screws 

and remove the cover. Assemble the chassis to the 

probe flange and secure with the screws provided 

with the probe.

Connect the ring terminal wire lead to the probe 

terminal stud and secure with the lock washer and 

wing nut provided. With the power removed, pro-

ceed with installation and wiring according to the 

instructions on page 2. Upon completion of wiring 

replace control cover. 

4

R E M O T E   M O U N T E D   M O D E L S   O N LY

A.

 To secure mounting plate to boiler jacket,* pre-drill two 3/32" pilot holes using the mounting 

plate as a template. Secure plate with sheet metal screws provided. Attach control to mounting 

plate by slipping keyholes in back of chassis over pre-mounted screws on plate. Tighten screws. 

B.

 Using a wire nut, attach a wire (min 90°C) to the pigtail lead in the control box. Attach the other 

end to the probe terminal in the remote probe housing. Attach a second wire between the ground 

screw on the control chassis and one of the four screws in the remote probe housing. Note: Wires 

and wire nuts not provided.

*Or other suitable surface

B

A

WARNING

  Frozen pipes/water damage. Central heating systems are    

  prone to shut down as a result of power or fuel outages, 

safety related fault conditions or equipment failure. Installation of freeze protection 

monitoring or other precautions is recommended for unattended dwellings in climates 

subject to sustained below-freezing temperatures.

Отзывы: