7
INSTALLATION
GENERAL
1.
Follow all local codes, or in the absence of local codes, follow the current
edition
of the Na
tional
Fuel
Gas Code: ANSI Z223.1/NFPA 54 in the USA or B149.1 Natural Gas and Propane Installa
tion
Code in
Canada.
2.
All gas boilers require careful and correct installa
tion
to ensure safe and e
fficie
nt opera
tion.
This manual must be followed exactly. Read the “Safety Guidelines”
section.
3.
The manifold gas pressure is preset at the factory. It is computer controlled and should not need
adjustment.
4.
Maintain proper space for servicing. Install the unit so that it can be connected or removed easily.
5.
The boiler must be installed in a loca
tion
where the proper amount of combus
tible
air will be
available to it at all
times
without obs
tructions.
6.
The electrical c
onnection
requires a means of disconne
ction,
to terminate power to the water heater.
This is necessary for servicing and safety purposes.
7.
Do not install the unit where the exhaust vent is poin
ting
into any opening in a building or where the
noise may disturb your neighbors. Ensure that the vent termina
tion
meets the minimum distance
requirements set by code, including minimum clearances from doorways or openings.
8.
P
articles
from
flou
r, aerosols, and other contaminants may clog the air vent, build up and reduce
the
functions
of the rota
ting
fan, cause improper burning of the gas, or cause damage to the water
heater. Regularly ensure that the area around the unit is dust- or debris-free. Regular maintenance is
recommended for these types of environments. Direct Ven
ting
is recommended.
9.
Venting:
• If the boiler is used as a direct-vent appliance, the unit requires a 3 in. (76 mm)
combus
tible
air supply pipe. The intake pipe must be sealed
airtig
ht.
• Termina
ting
the ven
ting
through a sidewall is recommended for the direct-vent system.
• Running the exhaust vent and the intake pipe parallel is recommended.
• Termina
ting
the exhaust and intake on the same wall/surface is recommended. Termina
ting
in
the same pressure zone allows for pressure balancing, which prevents nuisance shutdowns.
• Only install the boiler in a heated area where below freezing temperatures cannot occur.
The warranty does not cover damage caused by freezing.
• The boiler must be securely mounted to a wall or other suitable structure.
Содержание Smart 115 PLUS
Страница 49: ...49 Boiler Notes ...