
Performing maintenance
Replacing the filling level limit switch
When replacing the filling level limit
switch (190), observe the position of the
sensors (A). Align the sensor (A) parallel
to the direction of flow.
VMU 1 ATEX II 2G IIC T4
en(us)
Page 48 / 68
BeWa VMU_1_ATEX-II2GIICT4_10000649233 en-us 2017-03-07.doc
2017-03-07