
Performing maintenance
Depressurizing
Carry out the depressurization first via the air bleed screw (1). Then open the
drain ball valve (2) and collect the escaping fluid with a suitable container.
The visual back-pressure indicator
shows the pressure in the housing.
Do not open the housing until you
have depressurized it and the
pressure gauge shows no pressure.
VMU 1 ATEX II 2G IIC T4
en(us)
Page 39 / 68
BeWa VMU_1_ATEX-II2GIICT4_10000649233 en-us 2017-03-07.doc
2017-03-07