background image

Make the plumbing connections as indicated on the front cover of the heater:

•  

Inlet (cold mains) 

•  

Outlet (hot tap/outlet) 

The inlet is the right hand pipe and the outlet the left, when viewed from the front. 

The supplied gauze should be installed into the cold inlet side of the plumbing.

All pipework should be adequately earthed.

It is recommended a service valve be fitted on the cold feed to facilitate 

future maintenance.

Turn on the cold mains feed and draw water through the heater for several minutes by

opening the hot outlet. Ensure a smooth flow of water from the outlet to confirm all air

is purged from the system and check for leaks on all connections. This step is required

every time the heater has been drained for any reason, such as routine maintenance.

5

Flow

HOT

OUTLET

HOT TAP

SERVICE VALVE

COLD MAINS

SUPPLY

L

N

E

PCB

RELAY

THERMAL

CUT OUT

TANK

TRIAC

230mm

380mm

90mm

70mm

IN96T_Layout 1  08/06/2015  16:12  Page 5

Содержание Aquila IN96T

Страница 1: ...Product Instruction Manual Aquila IN96T 9 6kW Instantaneous inline water heater V15 6 4 Version 3 2 Jan 2015...

Страница 2: ...in accordance with the latest edition of the IEE wiring regulations Only connect the appliance to a power supply that conforms to the specification stated on the rating plate The appliance must be ea...

Страница 3: ...ak could be unusually severe eg above computer equipment When choosing a location for the heater consider the visibility of any leak that might arise This is particularly important when locating in a...

Страница 4: ...losses through the pipework Once the preferred location has been decided offer the heater to the wall Ensure the unit is level and mark the hole locations onto the final mounting surface see diagram...

Страница 5: ...ately earthed It is recommended a service valve be fitted on the cold feed to facilitate future maintenance Turn on the cold mains feed and draw water through the heater for several minutes by opening...

Страница 6: ...ia a double poled switch The heater must be earthed Isolate electric and water supply before electrical installation Refer to the rating label on the heater to ensure correct specification of installa...

Страница 7: ...rate at which hot water can delivered Selecting a temperature Turn on the heater using the Power On Off On first installation the temperature setting will default to 380C To adjust this press the up d...

Страница 8: ...intain a suitable temperature during cold periods Overheat Protection In the unlikely event of a heater malfunction the unit is fitted with a manual reset thermal cut out This is located under the cov...

Страница 9: ...t 42A 42A Min Max temperature setting 30 60 C Over heat protection temperature 75 C 5 Minimum operating flow rate 2 5L Min Minimum operating pressure 0 1MPa Maximum rated pressure 0 75MPa Required Wat...

Страница 10: ...setting see section 6 1 No display on Unit in standby Turn On the heater the heater see section 6 1 Power supply problem Check that power is supplied to heater and is correct specification as per the...

Страница 11: ...r a period of one year from the date of purchase Hyco will in its sole discretion replace repair or refund any faulty unit Incorrect installation and failure to follow correct operating instructions a...

Страница 12: ...king life this equipment must not be disposed of as household waste It must be taken to a local authority waste collection centre or to a dealer providing this service Disposing of electrical and elec...

Отзывы: