10
2. Low voltage display meter
Figure 3 Low voltage display meter
①
LCD
②
signal sampling input
③
Power switch
④
DC/AC selection
⑤
High/low gear switching
VI. Measurement preparation
1. This device is HV equipment, please make test in open field.
2. Service conditions:
Temperature :0~40
℃
, humidity≤85%RH.
3. Power on the LV display meter to check if the LCD display clearly, if not
clear or nothing display, please check the battery inside of the display meter.
VII. Operation instruction
1. Correct connection
Correctly connect as Figure 4 shown. High-voltage input connect to the
terminal at the top of equipotential ball, using earth lead connect ground
terminal to earth, HV divider and LV display meter should be connected with the
supporting coaxial cable. Completed connection, please check the connections
and confirm all is correct, then select the appropriate gear and range, you can