background image

 

 6 

B1 

 

Fig.6

 

 

4.2 

Minimum Requirement for Housing the Machine 

 

Please comply with the following terms to maximize the life and performance of the machine and its 

components. 

The Main voltage and frequency complying with the requirements for the machine’s motor. 

Environment temperature from –10°C to +50°C. 

Relative humidity not over 90%. 

Altitude not over 1000m 

 

4.3 

Anchoring the Machine 

 

-Position the machine on a firm and level concrete floor. 

-Maintain a minimum distance of 800mm from the wall to 

rear of the machine. 

 

-Anchor the machine to the ground, as shown in the diagram, 

using screws and expansion plugs or sunken tie rods that 

connect through holes in the base. 
-Ensure that it is sitting level. 
 

4.4 

Assembling Loose Parts 

A. 

Attach Riser handle to the necessary crankshaft.   

 

 

 

 

 

4.5 

Electrical Connection of the Machine 

Make sure whether the voltage of the acquired machine is 

220V/1 phase or (220V, 380V, 400V,440V)/3 phases prior to 

connection.  If the machine cannot be operated after wires 

have been connected, please check the following items: 

1. 

Is the Emergency switch released? 

2. 

Is the door of the electrical cabinet properly closed 

and switched to ON (locked) position? 

3. 

Is the safety guard in the proper position (closed)? 

4. 

Is the down-feed rate set to “0”? 

4.6 

Coolant  

Before operating a new machine, add coolant to the coolant 

tank by looking at the pilot (window) indicator at the right wall 

of base, fill the coolant to at least half way through the 

window (A, Fig.5) (minimum 6 liters). User can choose the 

one most suitable for their requirements. For your reference 

SHELL LUTEM OIL ECO is highly recommended. 

The ratio of oil and water is 50% respectively. 

The minimum percentage of oil diluted in water is 8~10%. 

Cleaning is required when iron filings clog the screen 

(B,Fig.6) at the bottom right corner of the water drain entry  

at the base. 

Please refer to the drawing A1and B1 on the machine for 

clear indication. 

 

 

 

 

 

 

 

Riser handle 

A1 

 

Fig.

 

 

Содержание HU 40 GTF Super Vario

Страница 1: ...HU 40 GTF Super Vario C O L U M N D R I L L I N G M A C H I N E...

Страница 2: ...ating cutting tools Keep children away All visitors should be kept a safe distance from the work area Never leave the machine running unattended Turn the power off Do not leave the machine until it co...

Страница 3: ...erence 10 6 3 Cleaning and Accessing the coolant system 11 7 Lubrication and Routine Maintenance 11 7 1 Lubrication 11 7 2 Daily Maintenance 12 7 3 Weekly Maintenance 12 7 4 Monthly Maintenance 12 7 5...

Страница 4: ...hine s spindle is equipped with mechanical automatic down feed to set the drilling when handling large number of workpiece In terms of material the entire machine body including the base table and col...

Страница 5: ...3 1 Description of Machine...

Страница 6: ...ning After daily use disconnect machine from power source or press emergency stop switch to shut off the power completely Do not keep the machine connected over 24 hours it may cause damage to the mac...

Страница 7: ...ing of coolant system 4 Machine Installation After unpacking please follow the steps below to install your machine 4 1 Positioning the Machine 1 Check to see if the head is secure to the column with 1...

Страница 8: ...achine is 220V 1 phase or 220V 380V 400V 440V 3 phases prior to connection If the machine cannot be operated after wires have been connected please check the following items 1 Is the Emergency switch...

Страница 9: ...t depth scale 1 Loosen the lock handle M Fig 7 and adjust the depth indicator 2 Lock the handle M Fig 7 to set the depth stop 3 Release the handle U Fig 7 For drilling in auto mode use the down feed d...

Страница 10: ...epth stop will disengage the automatic down feed when the zero setting is reached The down feed lever will transfer to manual mode and return the drill to starting height 5 5 Using the micro feed hand...

Страница 11: ...t the spindle speed F Fig 1 5 6 1 In Drilling Mode 11 Lock in manual mode or select automatic mode and feed rate Turn handle N Fig 9 or Refer to Automatic Down feed 5 4 12 Begin drilling 5 6 2 In Tapp...

Страница 12: ...difficulty drilling or the spindle bounces automatically during the process of drilling stop operation right away and check if the bit is sharp or the material is too hard If the material is too hard...

Страница 13: ...weekly monthly or semi annual and annual Neglecting the machine maintenance will result in premature wear and poor performance 7 1 Lubrication 1 Lubricate Column Quill and the nozzle as shown on P1 a...

Страница 14: ...Disposal Oil products must be disposed in a proper manner following local regulations 7 9 Special Maintenance Special maintenance operations must be carried out by skilled personnel However we advise...

Страница 15: ...verter Ensure the cooling device be free of any foreign objects or dirt O L The frequency converter detects the output exceeds 150 of normal standards for 1 minute Check if the motor is overloaded Ex...

Страница 16: ...14 9 Drawings And Parts Lists 9 1 Explosion Drawing A Motor pulley assembly...

Страница 17: ...et Cap Screw M8x35 4 B 36 B 3 Oil Seal T Pi 25x5 38 1 2 B 37 Taper Pin 5x38 2 B 38 Gear Box 1 B 39 Oil Fiter 3 8 x3 8 1 NO Description Size Q TY B 40 Tube 1 B 41 Oil Seal 62x35x10 1 B 42 C Clip R 47 1...

Страница 18: ...16 9 3 Explosion Drawing B Head Spindle assembly...

Страница 19: ...3 A 40 Screw M5x6 4 A 42 Set Knob 1 A 46 Hex Socket Cap Screw M6x16 1 A 47 Special Washer 1 A 48 Scale Ring 1 NO Description Size Q ty A 49 Hex Socket Cap Screw M6x16 3 A 50 Allen Wrench 1 A 51 Lock N...

Страница 20: ...Gear Bracket 1 A 135 Hand Body 1 A 136 C Clip S 45 1 A 137 Ball Bearing 6009ZZ 2 A 138 Bearing Spacer 1 A 139 Spindle Sleeve M12x80 1 NO Description Size Q ty A 140 Key 3x10 1 A 141 Drive Spindle Pul...

Страница 21: ...19 9 5 Explosion Drawing C Column Table Base...

Страница 22: ...ear 1 C 26 Key 5x5x20 1 C 27 Worm Shaft 1 C 28 Thrust Bearing 51102 1 C 29 Key 5x5x60 1 C 30 Shaft 1 C 31 Hex Socket Cap Screw M8x35 3 C 32 C Clip S 25 2 NO Description Size Q ty C 33 Spring Pin 4x25...

Страница 23: ...21 9 7 Explosion Drawing D Electric box...

Страница 24: ...a Inverter for 460V 1 E 11 Washer M4 2 E 12 Screw M4x20 2 E 13 Washer M6 1 E 14 Hex Socket Cap Screw M6x16 1 E 15 Insulation Board 140x78x3 1 E 16 Fuse 0 5A 2 E 16A Fuse 3A 1 E 17 Washer M4 4 E 18 Scr...

Страница 25: ...23 9 9 Explosion Drawing E Control Panel...

Страница 26: ...ket 1 D 11 Washer M8 2 D 12 Hex Socket Cap Screw M8x20 2 D 14 Screw M5x8 2 D 15 Oil Filer Cover 1 D 16 Cross Head Screw 3 16 x3 8 2 D 17 Washer 3 16 4 D 18 Cross Head Screw 3 16 x3 8 4 D 19 Top Cover...

Страница 27: ...V 220 240V 2HP 1 DALTA VFD M CE BR Braking resistors 200W 400 200W 70 1 DALTA CE VR Adjust speed switch 1 DALTA RV 24YN20S B152 SB3 SB2 Push buttons on Stop 600V PL 24V 1a 250V 10A 1b 1 1 MACK BFL 22G...

Страница 28: ...26 9 12 Electrical Drawing Wiring Diagram...

Страница 29: ...e Manufacturer and importer assume no responsibility for defects which result from not reading the manual carefully or wrong use of the machine No rights can be derived from this manual All rights res...

Страница 30: ...2018 V1...

Отзывы: