5
3.4
The Machine Base
The Machine base houses the coolant tank and pump. The
coolant tank is a reservoir to hold coolant. The coolant
pump transfers coolant up to the machine head and onto the
drill bit. Coolant is a solution that lowers tool wear and
enhances drilling by cooling and lubricating the drilling tool.
Before operating a new machine, add coolant to the coolant
tank by referring the install section 4.6. When iron filings
clog the screen, cleaning will be required, please refer to the
section of 6.3 cleaning and accessing of coolant system.
4 Machine Installation
After unpacking, please follow the steps below to install your
machine.
4.1
Positioning the Machine
1.
Check to see if the head is secure to the column
with 10mm hex wrench (B, fig. 4).
!Warning
: Failure to lock the machine head may result in
machine damage or personal injury.
2.
Position the belt (with a load capacity of about
500kgs) at the points as marked (K, fig. 4) below the
machine head to lift the machine.
3.
The worktable of the machine can be rotated 360
o
,
so choose a location with enough space and solid
foundation.
4.
Initial Cleaning
Machine is shipped with a rustproof oil coating.
Clean the rustproof oil coating from all exposed
metal surface. Then apply oil/grease.
P
Fig. 3
Fig.4
K
K
B
Содержание HU 40 GTF Super Vario
Страница 1: ...HU 40 GTF Super Vario C O L U M N D R I L L I N G M A C H I N E...
Страница 5: ...3 1 Description of Machine...
Страница 16: ...14 9 Drawings And Parts Lists 9 1 Explosion Drawing A Motor pulley assembly...
Страница 18: ...16 9 3 Explosion Drawing B Head Spindle assembly...
Страница 21: ...19 9 5 Explosion Drawing C Column Table Base...
Страница 23: ...21 9 7 Explosion Drawing D Electric box...
Страница 25: ...23 9 9 Explosion Drawing E Control Panel...
Страница 28: ...26 9 12 Electrical Drawing Wiring Diagram...
Страница 30: ...2018 V1...