background image

HUSSONG MANUFACTURING CO., INC.

INSTALLATION AND 

OPERATION MANUAL

 

ͷ

Do not store or use gasoline or other 

flammable vapors and liquids in the vicinity 

of this or any other appliance.

 

ͷ

WHAT TO DO IF YOU SMELL GAS

• 

Do not try to light any appliance.

• 

Do not touch any electrical switch; do 

not use any phone in your building.

• 

Leave the building immediately.

• 

Immediately call your gas supplier from 

a neighbor’s phone. Follow the gas 

supplier’s instructions.

• 

If you cannot reach your gas supplier, 

call the fire department.

 

ͷ

Installation and service must be performed 

by  a  qualified  installer,  service  agency  or 

the gas supplier. 

    WARNING:

FIRE OR EXPLOSION HAZARD

Failure  to  follow  safety  warnings  exactly 

could  result  in  serious  injury,  death,  or 

property damage.

This  appliance  may  be  installed  in 

an  aftermarket,  permanently  located, 

manufactured  home  (USA  only)  or  mobile 

home, where not prohibited by local codes.
This  appliance  is  only  for  use  with  the  type 

of  gas  indicated  on  the  rating  plate.  This 

appliance is not convertible for use with other 

gases, unless a certified kit is used.

INSTALLER: Leave this manual with the appliance. 

 

CONSUMER: Retain this manual for future reference.

English and French installation manuals are available through your 

local dealer. Visit our website 

www.kozyheat.com

.

Les manuels d’installation en français et en anglais sont disponibles 

chez votre détaillant local. Visitez 

www.kozyheat.com.

DANGER

HOT GLASS

 WILL

CAUSE BURNS

DO NOT TOUCH

 GLASS

UNTIL COOLED

NEVER

 ALLOW CHILDREN

TO TOUCH GLASS

A  barrier  designed  to  reduce  the  risk  of  burns 

from the hot viewing glass is provided with this 

appliance and shall be installed for the protection 

of children and other at-risk individuals.

B E L L I N G H A M   5 2

Model #BHM-52

Direct Vent Gas Fireplace

Hussong Mfg. Co., Inc. 

BHM-52 Report No: 19-554

Rev.1, May 2020

Starting Serial Number: 

20 300000 26

Содержание Kozy Heat BELLINGHAM 52

Страница 1: ...home USA only or mobile home where not prohibited by local codes This appliance is only for use with the type of gas indicated on the rating plate This appliance is not convertible for use with other...

Страница 2: ......

Страница 3: ...cated not only to functionality and reliability but also customer safety We offer our continual support and guidance to help you achieve the maximum benefit and enjoyment from your Kozy Heat gas firep...

Страница 4: ......

Страница 5: ...ertical Natural Draft Vent Termination 39 6 2 Minimum Natural Draft Vent Termination Clearances 40 7 0 VENTING 41 7 1 Approved Vent Systems 41 7 2 Venting Requirements 41 7 3 Natural Draft Vent Restri...

Страница 6: ......

Страница 7: ...period a battery operated carbon monoxide detector with an alarm shall be installed 1 3 2 Approved Carbon Monoxide Detectors Each carbon monoxide detector as required in accordance with the above prov...

Страница 8: ...and Propane Installation Code local authorities or codes having jurisdiction in you area regarding derate guidelines 2 1 1 1 US Installations Refer to the American Gas Association guidelines for the g...

Страница 9: ...52Dimensions 269 16 675mm 655 8 1666mm 289 16 725mm 17 432mm 527 16 1332mm 307 8 784mm 41 1047mm 585 8 1489mm 50 1282mm 153 16 385mm 13 349mm 245 16 618mm 6 152mm 33 851mm LEFT SIDE FRONT VIEW TOP VI...

Страница 10: ...appliance and shall be installed for the protection of children and other at risk individuals If the safety barrier screen becomes damaged the barrier shall be replaced with Hussong Mfg Co Inc barrie...

Страница 11: ...y and KZK Installation on page 21 All vented cavity options have the same minimum chamber and ceiling dimension requirements as the standard installation dimensions in this section The fireplace chamb...

Страница 12: ...of the fireplace 2 Align nailing flanges with holes on the outside corners of fireplace with the stand off flanges on the nailing flanges facing away from the fireplace 3 Secure the nailing flanges t...

Страница 13: ...rovides Minimum distance to header Contact point for non combustible material above the fireplace Attachment for the header heat shield 1 Locate the stand off assembly and header heat shield on top of...

Страница 14: ...4 19mm trim 8 203mm Mantel 6 152mm deep from fireplace finishing edge 11 1 2 292mm Minimum rough opening height 50 1 2 1283mm Minimum rough opening width 65 5 8 1667mm Minimum rough opening depth 28 3...

Страница 15: ...width and depth of the appliance This fireplace may be elevated off the floor provided it is properly supported by framing materials and maintains ceiling clearances If installed above floor level a...

Страница 16: ...maintain a 1 25mm clearance to combustibles on all surfaces of the pipe See Figure 3 6 on page 17 3 6 2 Vertical Terminations Follow vent pipe manufacturer s installation instructions for vertical te...

Страница 17: ...ances 73 1854mm 28 730mm Natural gas and propane rigid pipe Natural draft minimum horizontal terminations 28 730mm 88 2235mm 11 279mm 11 279mm minimum clearance between any venting and the top of encl...

Страница 18: ...ea where the appliance is protected from direct precipitation Based on your design options and installation choices standard installation vented cavity or Komfort Zone Kit follow your specific require...

Страница 19: ...mum weatherproof overhang in front and sides M i n i m u m w e a t h e r p r o o f o v e r h a n g i n f r o n t a n d s i d e s Minimum weatherproof overhang in front and sides M i n i m u m w e a t...

Страница 20: ...ee heat transfer kit manuals HTK EXT HTK INT for more information Remove 2 cover plate for a Komfort Zone Kit or vented cavity options for the front or top vent cavity Figure 3 10 Heat Transfer Kit Co...

Страница 21: ...t correspond to the vented cavity option you have chosen See Section 3 8 Heat Distribution Cover Plates on the previous page 2 Remove the convection baffle from the appliance The baffle is secured by...

Страница 22: ...d cavity air discharge opening Figure 3 14 MUST be followed The distance between a sprinkler head and discharge opening cannot be less than 60 1524mm in length at every point from the origin of the di...

Страница 23: ...These are minimum dimensions shown for the air discharge opening and the opening may be increased if desired as long as all requirements are followed It is recommended to limit your opening size for a...

Страница 24: ...he fireplace cavity off it cannot have any vent pipe running through the top with a ceiling firestop This installation method can alleviate any possible concerns with paint discoloration from heat or...

Страница 25: ...ted Cavity Alternative Installation with Overhang 6 152mm 4 101mm 52 1321mm 6 152mm 8 203mm 88 2235mm 3 76mm 60 1524mm Air discharge overhang Air discharge opening front 3 x 52 minimum Enclosure top m...

Страница 26: ...are followed It is recommended to limit your opening for aesthetic purposes and to avoid items falling into the enclosure Figure 3 20 shows the fireplace chamber ending 1 1 2 38mm from the ceiling on...

Страница 27: ...st be installed Air discharge opening Air discharge overhang Air discharge overhang Width of fireplace chamber D MAX MIN MIN MAX MIN 88 2235mm MIN Figure 3 21 Top Vented all 3 sides Cavity Crown Moldi...

Страница 28: ...s The adjacent sidewall minimum clearance is 6 152mm from the side finishing edges of the fireplace See Figure 4 3 on page 31 4 1 3 Facing Requirements Non combustible material is required at the top...

Страница 29: ...203mm 2 64mm 33 850mm 31 786mm 88 2235mm 28 730mm 12 305mm 9 229mm 6 152mm 14 356mm Each square represents 1 25mm of projection Top finishing edge Bottom finishing edge Combustible Floor Non combustib...

Страница 30: ...1 May 2020 Figure 4 2 Standard Installation Non combustible Mantel Clearances 8 203mm 41 1054mm 88 2235mm 28 730mm 12 305mm 9 229mm 6 152mm Each square represents 1 25mm of mantel projection Combustib...

Страница 31: ...BHM 52 R 1 May 2020 Hussong Mfg Co Inc Kozy Heat Fireplaces FACING AND FINISHING 31 Figure 4 3 Adjacent Sidewall Clearances 88 2235mm 6 152mm unlimited...

Страница 32: ...ACING AND FINISHING Hussong Mfg Co Inc Kozy Heat Fireplaces BHM 52 R 1 May 2020 Figure 4 4 Framed Opening Clearances 50 1282mm 2 63mm 655 8 1667mm 307 8 784mm 527 16 1332mm 69 16 167mm 88 2235mm 17 43...

Страница 33: ...G 33 Figure 4 5 Minimum Finishing Dimensions 495 8 1261mm 2 64mm 52 1333mm 33 851mm 81 16 187mm 685 8 1743mm 1 38mm Non combustible material only Combustible material allowed Combustible material allo...

Страница 34: ...ptions based on notched tab position See Figure 4 6 below for a flush or a recessed mount 3 Align the notched tabs located on the back of the safety barrier screen with the slots on the glass valance...

Страница 35: ...terial may be attached to the bottom front cover panel using a silicone sealant that has a 300 F 149 C continuous exposure rating It is acceptable to pre drill holes and to use self tapping screws pri...

Страница 36: ...of projection Top finishing edge Bottom finishing edge Combustible wall finish up to 1 25mm may be installed over cement board and butt up to the finishing edge around the opening 12 305mm 9 229mm 6 1...

Страница 37: ...ustible Wall Finish up to 1 25mm thick 88 2235mm 28 730mm Non combustible zone Non combustible material Air discharge opening Combustible wall finish up to 1 25mm thick may be installed up to the top...

Страница 38: ...of psi 3 5 kPa For test pressures equal to or less than psi 3 5 kPa the appliance must be isolated from the gas supply piping system by closing its individual manual shut off valve A listed and Commo...

Страница 39: ...h Feet Meters Flat to 6 12 1 0 0 30 Over 6 12 to 7 12 1 25 0 38 Over 7 12 to 8 12 1 5 0 46 Over 8 12 to 9 12 2 0 0 61 Over 9 12 to 10 12 2 5 0 76 Over 10 12 to 11 12 3 25 0 99 Over 11 12 to 12 12 4 0...

Страница 40: ...pply inlet to building or the combustion air inlet to any other appliance 12 30cm 9 23cm K Clearance to mechanical air supply inlet 6 1 83m 3 91cm above if within 10 3m horizontally Massachusetts 10 3...

Страница 41: ...mney Supply Inc VDV HC05 VDV VC05 VDV VCH05 Selkirk 5DT HC 5DT HCR 5DT VT 5DT VC 7 1 2 Approved 4 x 6 5 8 Vent Systems This appliance may be reduced from a 5 x 8 to a 4 x 6 5 8 vent system using a ven...

Страница 42: ...outer most ring knocked out will create the least amount of restriction Follow Figure 7 1 for restrictor plate installation before attaching venting or through the baffle if venting is already attache...

Страница 43: ...tems on page 41 Refer to the vent manufacturer s installation instructions i Minimum Maximum Vertical Terminations 3 914mm minimum vertical length 50 15 24m maximum vertical length termination cap ii...

Страница 44: ...Minimum 36 Vertical Vent Pipe Minimum Maximum Horizontal Termination 36 914mm vertical vent pipe 90 horizontal elbow 6 152mm minimum horizontal 6 1 83m maximum horizontal termination cap iii Minimum 4...

Страница 45: ...Section 7 1 Approved Vent Systems on page 41 Refer to the vent manufacturer s installation instructions For maximum vertical and maximum horizontal combination venting the vent terminations must be w...

Страница 46: ...the bottom frame rail 2 Use the provided tool to pull the 4 latch assemblies to latch with the flange on top of the glass valance 3 Reinstall safety barrier screen BOTTOM FRAME RAIL GLASS VALANCE ON...

Страница 47: ...Side Refractory Panel Installed Figure 8 5 Side Black Glass Panels Installed 8 3 1 Refractory Panels 1 Install back refractory panel Secure with panel clips previously bent See Figure 8 3 2 Install s...

Страница 48: ...ainst the log stop bracket flanges Figure 8 6 2 Use a steel or stiff bristle nylon brush to distribute a thick layer of fine rock wool embers across the whole burner and burner port holes 3 Align the...

Страница 49: ...ith the notches in log BH52 2 and BH52 3 Figure 8 8 Place as shown in Figure 8 10 8 Align log BH52 10 with the notches on logs BH52 9 and BH52 6 Figure 8 9 and place as shown in Figure 8 10 9 Align lo...

Страница 50: ...ace logs BH52 14 and BH52 15 on the ember bed as shown 14 Place the 6 charred pieces on top of the ember bed We show one way to place the pieces and you may place the pieces at your discretion 15 Dist...

Страница 51: ...hen finished 8 5 2 Control Board Removal 1 Disconnect electrical power 2 Locate the manual valve upstream of the appliance connector and close valve 3 Remove the safety barrier screen and glass frame...

Страница 52: ...with screws previously removed 3 Reinstall burner support brackets if removed 4 Reinstall the main log support Align the holes in the main log support with the holes in the firebox back wall and in le...

Страница 53: ...remove the grounding prong from this plug 9 1 Electrical Specifications This appliance when installed must be electrically grounded in accordance with local codes or in the absence of local codes wit...

Страница 54: ...sconnect all electrical power from the fireplace before performing this task ATTENTION If converting to propane complete the conversion before installing any light kit components Follow instructions p...

Страница 55: ...Remove the safety barrier screen and glass frame assembly if installed 2 Remove the top light kit covers and its roped glass 8 screws total Save screws 3 Install or replace 2 halogen bulbs included wi...

Страница 56: ...pliance 10 Press the wireless remote ON button 11 If the appliance will not operate follow the instructions To Turn Off Gas To Appliance and call your service technician or gas supplier OPERATING INST...

Страница 57: ...in ON OFF toggle switch to ON position for remote control operation of the main burner and fireplace features 7 Reinstall all components previously removed 10 3 Reset the System for Manual Operation 1...

Страница 58: ...sparks for 60 seconds 3 If there is no flame ignition rectification within the 60 second time frame the IFC module will stop generating sparks for approximately 35 seconds 4 After 35 seconds of wait t...

Страница 59: ...ilot system to the standing pilot option The standing pilot will keep the firebox warm and establish a draft in the vent which allows the main burner to ignite with less air flow disruption When the s...

Страница 60: ...ame levels If the smart thermostat operation is activated then the manual adjustment of the flame height will be disabled 1 Verify the system is in the ON position and the flame level is set at maximu...

Страница 61: ...l will still operate the main burner on and off and function flame fan and light modulation To deactivate this function 1 Verify all 3 AAA batteries are installed in the remote control 2 Remove 1 AAA...

Страница 62: ...3 Press the down arrow key to turn the ember bed light kit OFF 4 A single beep will confirm reception of the command 10 9 11 1 Adjust Ember Bed Light Kit Intensity The ember bed light kit intensity ca...

Страница 63: ...and maximum recommended pressure settings 4 Turn off burner and pilot 5 Disconnect hose and tighten the inlet IN pressure tap by turning screw clockwise Screw should be snug Do not over tighten 6 Reli...

Страница 64: ...cement section 8 4 pg 48 before adjusting the venturi 1 Remove the safety barrier screen and glass frame assembly 2 Remove log set lava rock and ember bed media tray 3 Remove refractory panel set or b...

Страница 65: ...supply and call a qualified service technician 11 2 2 1 Restrictor Plate Installation 1 Remove the safety barrier and the glass frame assembly 2 Locate the 5 127mm exhaust pipe in the firebox ceiling...

Страница 66: ...it No propane in tank Check propane tank Refill if necessary Low gas pressure Consult a plumber or a gas supplier Can be caused by situations such as a bent line too narrow diameter or pipe or a low l...

Страница 67: ...Venturi air shutter may need to be opened slightly to allow more air into the gas mix Refer to Section 11 2 1 Burner Venturi on page 64 Incorrect vent cap installation Adjust if necessary Vent cap blo...

Страница 68: ...KPV please reference the manual included with the kit For natural draft vent installation refer to Section 7 0 Venting on page 41 Performed by Qualified Service Person Frequency Annually Action Exami...

Страница 69: ...f the flame safety system Pilot or Flame rectification device Visually check pilot light when in operation Inspect and ensure the lighting of the main burner occurs within 4 seconds of the main gas va...

Страница 70: ...pane Burner Orifice CENTER 1 90mm 700 2190 Fan Light Kit Wire Harness 700 655 Propane Burner Orifice SIDES 63 700 263 Pilot Assembly Natural Gas 900 064A Conversion Kit Natural Gas NCK BH52 SPB Pilot...

Страница 71: ...12 Log BH52 12 BH52 13 Log BH52 13 BH52 14 Log BH52 14 BH52 15 Log BH52 15 1 2 Lava Rock 600 715 Rock Wool Embers 900 REMB REFRACTORY PANEL SETS Chicago Brick Refractory Set BH52 CB900 Ledgestone Refr...

Страница 72: ...ut not limited to improper chimney venting installation will also render this warranty void 7 This warranty does not cover installation and operational related problems such as environmental condition...

Страница 73: ......

Отзывы: