background image

©2007 HUSSMANN CORPORATION • BRIDGETON, MO  63044-2483 U.S.A.
U.S. & CANADA 1-800-504-4828 • WWW.CHILLCHAMBER.HUSSMANN.COM

13

P/N 31033596_B

01 June 2007

MAXI-140

8. To remove the fluorescent lamp, disconnect
the two individual connectors from each end. 

9. Remove from holding clips. 

10. Replace the lamp.

11. Reassemble in reverse order.

12. Plug the unit in. Turn on light switch.

13. Allow the unit to run for at least 
30 minutes before stocking with fresh product.

LED (Interior Lighting)

LED light tube must be replaced by a light
tube of the same size dimension and wattage as
the original. Always unplug unit before 
replacing LED light strip. 

Restocked beer 

may freeze.

1. Follow steps 1 through 7 of Fluorescent
Lamp Replacement.

2. Disconnect the LED connector.

3. With a screwdriver, loosen, but do not
remove, the LED lighting bracket from one
side only. 

4. Rotate loosened lighting bracket and remove
LED light tube.

5. Replace by positioning the LED light tube
with electrical wires to the right-hand side 
closest to slot. Do not wrap wires around the
LED light tube. Route the electrical wires
through the slot before re-connecting.

6. Reassemble in reverse order.

7. Plug the unit in. Turn on light switch.

8. Allow the unit to run for at least 
30 minutes before stocking with fresh product.

Two individual connectors

LED lighting bracket.

LED connector

Bracket

Route electrical cord

through here

Replacement LED tube
must be at same angle

Содержание MAXI-140

Страница 1: ...MAXI 140 Operator s Manual P N 31033596_B 01 June 2007...

Страница 2: ...entifying the type of application for which the case was certified ANSI NSF 7 Type II Display Refrigerator Freezer Beverage Cooler Intended for 80 F 55 RH Ambient Application This equipment is intende...

Страница 3: ...01 June 2007 MAXI 140 MAXI 140 MAXI 140 MAXI 140 MAXI 140 To reduce the risk of fire electrical shock or injury when using your Chill Chamber Always use a dedicated circuit with the Amperage stated on...

Страница 4: ...ppropriate equipment to safely lift and move the Chill Chamber to the preferred location in your business Carefully remove the shipping box Avoid scratching the Chill Chamber Recycle packing materials...

Страница 5: ...dicated 15 Amp circuit with grounded wall receptacle NEMA 5 15P Do not use extension cords Never use adapters If in doubt call an electrician Electrical requirements for the merchandiser are stated on...

Страница 6: ...ng The top door hinge has slots that allow the door to be adjusted if the gasket doesn t seal completely Use a nut driver to loosen the four hex head screws just enough to allow the hinge to move back...

Страница 7: ...NET scroll across the display Open the Safe NET controller using a small flat blade screwdriver to pop off the oval cover this may be tight Plug in the MAXI 140 Be careful of moving parts in the compr...

Страница 8: ...inutes are displayed then press SELECT Hours should flash With hours flashing use the UP or DOWN button until the correct hour is displayed Safe NET uses a 24 hour or military clock where 12 is noon P...

Страница 9: ...st the temperature display may move up 2 3 F 1 2 C Avoid opening the door during the defrost cycle Defrost is necessary because the Chill Chamber operates at temperatures below freezing 22 F 5 5 C Def...

Страница 10: ...ndEF number of defrosts determines the number of defrosts that occur in a 24 hour period beginning with the StAr first defrost parameter The maximum number of defrosts allowed in a 24 hour period is...

Страница 11: ...the display and gently press into place Run Before Stocking Allow the Chill Chamber to run at least 30 minutes before stocking LOADING 1 Add the maximum quantity 66 bottles allowed of Anheuser Busch...

Страница 12: ...based cleaners on acrylic parts Solvent oil or acidic based cleaners on any interior surfaces A hose on display or interior lights or any other electrical connection Do First disconnect electrical po...

Страница 13: ...he upper shelf Make sure that each shelf mounting slot engages with its mounting screw 7 Install the near most LH side and RH side screws into the upper shelf 8 Place the lower shelf flush against the...

Страница 14: ...ug unit before replacing lamp Restocked beer may freeze 1 Sell all product in the unit 2 Turn off lamp switch Unplug the unit 3 Remove shelves 4 Remove the two recessed screws from the canopy Screws a...

Страница 15: ...cing LED light strip Restocked beer may freeze 1 Follow steps 1 through 7 of Fluorescent Lamp Replacement 2 Disconnect the LED connector 3 With a screwdriver loosen but do not remove the LED lighting...

Страница 16: ...il from blocking with ice Very frequent door openings will eventually have an impact on product temperature and cause it to rise Avoid holding the door open while deciding on product selection countin...

Страница 17: ...ator Unusual Noise Unit not level Reposition and level the unit Unit contacting structure Reposition unit to provide space on all sides Rear grille loose Fasten grille to attenuate sound Slow to cool...

Страница 18: ...ssemblies If within the warranty period it can be proven to the satisfaction of Hussmann s warranty administration organization that there is impaired visibility through a multi glass assembly caused...

Страница 19: ...MERCHANTABILITY OR FITNESS AND HUSSMANN NEITHERASSUMES NORAUTHORIZESANY PERSON TOASSUME FOR IT ANY OTHER OBLIGATION OR LIABILITY IN CONNECTIONWITHTHE SALE OF ITS PRODUCTS ORANY PARTTHEREOF THISWARRAN...

Страница 20: ...22 F...

Отзывы: