11 SERVICE WORK ON THE CHASSIS
54
11.17
Installing front fender
A00138-10
Main work
–
Position front fender.
–
Mount and tighten screws
1
.
Guideline
Screw, front fender
M6
10 Nm (7.4 lbf ft)
–
Mount and tighten screws
2
.
Guideline
Screw, front fender
M6
10 Nm (7.4 lbf ft)
Finishing work
–
Install the start number plate. (
11.18
Removing the shock absorber
Preparatory work
–
Raise the motorcycle with a lift stand. (
K00978-10
Main work
–
Detach brake line from the brake line guide.
–
Remove screw
1
and lower the rear wheel with the
swingarm as far as possible without blocking the rear wheel.
Secure the rear wheel in this position.
–
Remove screw
2
, push splash protector
3
to the side,
and remove the shock absorber.
11.19
Installing the shock absorber
K00978-11
Main work
–
Push splash protector
1
to the side and position the shock
absorber. Mount and tighten screw
2
.
Guideline
Screw, top
shock absorber
M12
60 Nm (44.3 lbf ft)
Loctite
®
2701™
–
Mount and tighten screw
3
.
Guideline
Screw, bottom
shock absorber
M12
60 Nm (44.3 lbf ft)
Loctite
®
2701™
–
Attach brake line.
Содержание TC 85
Страница 1: ...OWNER S MANUAL 2018 TC 85 Art no 3402163en ...
Страница 2: ......