12 SERVICE WORK ON THE CHASSIS
51
12.12
Adjusting the steering head bearing play
Preparatory work
–
Raise the motorcycle with a lift stand. (
F00319-10
Main work
–
Loosen screws
.
–
Remove screw
.
–
Loosen and retighten screw
.
Guideline
Screw, top steering head
M20x1.5
12 Nm (8.9 lbf ft)
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid stresses.
–
Tighten screws
.
Guideline
Screw, top triple clamp
M8
17 Nm (12.5 lbf ft)
–
Mount and tighten screw
.
Guideline
Screw, top steering stem
M8
17 Nm
(12.5 lbf ft)
Loctite
®
243™
Finishing work
–
Check the play of the steering head bearing. (
–
Remove the motorcycle from the lift stand. (
12.13
Lubricating the steering head bearing
800010-10
–
Remove the lower triple clamp.
–
Install the lower triple clamp.
12.14
Removing the front fender
Preparatory work
–
Switch off all power consumers and switch off the engine.
–
Remove the headlight mask with the headlight. (
F00282-10
Main work
–
Remove screws
.
–
Remove screws
. Remove the front fender.
Содержание FE 450
Страница 1: ...OWNER S MANUAL 2017 FE 450 FE 501 Art no 3402103en ...
Страница 2: ......
Страница 95: ...15 ELECTRICAL SYSTEM 93 15 13 Diagnostics connector H00933 12 Diagnostics connector is located under the seat ...
Страница 122: ...26 INDEX OF SPECIAL TERMS 120 OBD On board diagnosis Vehicle system that monitors emission and safety related val ues ...