![Husqvarna FC 250 2017 Скачать руководство пользователя страница 43](http://html.mh-extra.com/html/husqvarna/fc-250-2017/fc-250-2017_owners-manual_172658043.webp)
11 SERVICE WORK ON THE CHASSIS
41
11.12
Adjusting the play of the steering head bearing
Preparatory work
–
Raise the motorcycle with a lift stand. (
–
Remove the handlebar cushion.
F00048-10
Main work
–
Loosen screws
. Remove screw
.
–
Loosen and retighten screw
.
Guideline
Screw, top steering head
M20x1.5
12 Nm (8.9 lbf ft)
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
–
Tighten screws
.
Guideline
Screw, top triple clamp
M8
17 Nm (12.5 lbf ft)
–
Mount and tighten screw
.
Guideline
Screw, top steering stem
M8
20 Nm
(14.8 lbf ft)
Loctite
®
243™
Finishing work
–
Check the steering head bearing play. (
–
Remove the motorcycle from the lift stand. (
–
Mount the handlebar cushion.
11.13
Greasing the steering head bearing
800010-10
–
Remove the lower triple clamp.
–
Install the lower triple clamp.
11.14
Removing the start number plate
F00049-10
–
Remove screw
. Swivel the start number plate to one side.
–
Remove screw
and take off the brake line guide and start number plate.
11.15
Installing the start number plate
F00050-10
–
Position the brake line and brake line guide on the start number plate.
–
Mount and tighten screw
.
–
Position the start number plate.
The holding lugs engage in the fender.
–
Mount and tighten screw
.
Guideline
Remaining screws, chassis
M6
10 Nm (7.4 lbf ft)
Содержание FC 250 2017
Страница 1: ...OWNER S MANUAL 2017 FC 250 Art no 3402095en ...
Страница 2: ......