
11 SERVICE WORK ON THE CHASSIS
64
–
Check the steering head bearing and adjust if neces-
sary.
Finishing work
–
Remove the motorcycle from the lift stand. (
11.16
Adjusting the steering head bearing play
Preparatory work
–
Raise the motorcycle with a lift stand. (
–
Remove the handlebar cushion.
V01541-10
Main work
(All models apart from special models)
–
Loosen screws
1
.
–
Remove screw
2
.
–
Loosen and retighten screw
3
.
Guideline
Screw, top steering
head
M20x1.5
12 Nm (8.9 lbf ft)
–
Using a plastic hammer, tap lightly on the upper triple
clamp to avoid stresses.
–
Mount and tighten screw
2
.
Guideline
Screw, top
steering stem
M8
20 Nm (14.8 lbf ft)
Loctite
®
243™
–
Tighten screws
1
.
Guideline
Screw, top triple
clamp
M8
17 Nm (12.5 lbf ft)
A00513-10
(ROCKSTAR EDITION)
–
Loosen screws
1
.
–
Remove screw
2
.
–
Loosen and retighten screw
3
.
Guideline
Screw, top steering
head
M20x1.5
12 Nm (8.9 lbf ft)
–
Using a plastic hammer, tap lightly on the upper triple
clamp to avoid stresses.
–
Mount and tighten screw
2
.
Guideline
Screw, top
steering stem
M8
20 Nm (14.8 lbf ft)
Loctite
®
243™
–
Tighten screws
1
.
Guideline
Screw, top triple
clamp
M8
17 Nm (12.5 lbf ft)
–
Check steering head bearing play. (
Содержание F2401U1
Страница 1: ...OWNER S MANUAL 2021 FC 450 FX 450 FC 450 ROCKSTAR EDITION Art no 3402445en ...
Страница 2: ......