
Installation Manual
2-92
Revision E
Hurco
Note
If the relay energizes when the ram is at the bottom of its stroke,
move the jumper JP1 (see the figure below) from pins 1 and 2 and
place on pins 2 and 3. Otherwise the gauge will advance when the
ram is at the bottom of its stroke instead of the top.
Figure 2-64. Relay Board with TB14 Connector - K4 Coil A (4) and K4 Coil B (5)
Important
The “Relay Board” and “TB14 Connector” sections earlier in this
chapter contain information about locating the connector and
opening the position on it.
Содержание AB6
Страница 3: ...iv Revision E Hurco...
Страница 5: ...vi Revision E Hurco...
Страница 13: ...Installation Manual xiv Revision E Hurco...
Страница 39: ...Installation Manual 1 24 Revision E Hurco...