
Built on Innovation
®
5
Setup
TEST PROGRAM
Runs all stations for a test run time.
1.
Press and hold
PRG
for three seconds.
2.
Station 1 appears. Press
+
or
–
to enter run time.
3.
Wait two seconds, each station will run for test run time.
SYSTEM OFF
Turn dial to system
OFF
position. No watering will occur in
this dial position.
PROGRAMMABLE RAIN OFF
1.
Turn dial to system
OFF
position and wait for
OFF
to
stop blinking.
2.
Press
+
or
–
to set the number of days to remain off.
3.
Turn dial back to
RUN
position. Display will show days off
remaining, and watering will resume when Off days reach
0. To cancel Rain Off, turn dial to
OFF
, wait until
OFF
stops
blinking, then turn dial back to
RUN
.
SENSOR BYPASS
Overrides sensor shutdown to allow watering.
1.
Move sensor
BYPASS
switch to
BYPASS
position.
2.
Return switch to
ACTIVE
to allow sensor shutdown.
SCHEDULING TIPS
•
A program is a watering schedule that includes Start
Time(s), Run Time(s), and Water Day(s).
•
A Start Time is the time of day the Stations in the
Program start watering.
•
A Run Time is the watering length per Station (zone).
•
One Start Time is needed to run the entire program.
FULL RESET
1.
Press and hold down the
–
, ►, and
PRG
buttons simultaneously.
2.
Press and release the
RESET
button on the right side of
the controller.
3.
When
DONE
appears on the LCD, release the
–
, ► and
PRG
buttons. The display should now show 12:00 AM.
The memory has now been cleared and the controller may
be reprogrammed.