during NEW installation. The meter will have to be removed manually after the blowout to
make sure any residual water is not sitting inside through the winter months.
Winterizing Using PVC Diverter Option
Find a Hunter Distributor closest to you using our interactive lookup - Get Hunter
[27]
Wire Distance (Controller to Valve)
Below is a chart indicating the maximum wire runs that can be used when installing