background image

Mortar Penetration Resistance Apparatus (H-4137) 

                     

                                   Page 2 of 6 

Instruction Manual          Rev.0; August 14, 2003

 

Copyright 2003 Humboldt Mfg. Co., Norridge, IL. 60706, U.S.A. 

All rights reserved. Printed in U.S.A.

 

 

 

TABLE OF CONTENTS 

  
  
     
  Page 

  
 
 

1. Scope ……………………………………    3 

 

2. Assembly   …………………………………… 3 

 

3. Preparation of Specimen…………………………………… 3 

 

4. Storage of Specimen …………………………………… 3 

 

5. Number of Specimen …………………………………… 3 

 

6. Procedure   …………………………………… 3 

 

7. Calculation  …………………………………… 4 

 

8. Replacement Needles …………………………………… 4 

 

9. Warranty   …………………………………… 5 

 

10. Drawing/Photo  …………………………………… 5 & 6 

 
 
 
 
 
 
 
 
 
 
 

Содержание H-4137

Страница 1: ...ved Printed in U S A Manufactured by Humboldt Mfg Co 7300 West Agatite Avenue Norridge Illinois 60706 U S A Customer Service Tel 1 708 456 6300 Fax 1 708 456 5412 Email hmc ehumboldt com USA Toll Free 1 800 544 7220 Website www humboldtmfg com Sold and Serviced by Humboldt and Authorized Dealers Worldwide H 4137 Instruction Manual MORTAR PENETRATION RESISTANCE APPARATUS ...

Страница 2: ...Copyright 2003 Humboldt Mfg Co Norridge IL 60706 U S A All rights reserved Printed in U S A TABLE OF CONTENTS Page 1 Scope 3 2 Assembly 3 3 Preparation of Specimen 3 4 Storage of Specimen 3 5 Number of Specimen 3 6 Procedure 3 7 Calculation 4 8 Replacement Needles 4 9 Warranty 5 10 Drawing Photo 5 6 ...

Страница 3: ...pen end of the spring barrel assembly and tighten the sleeve nut finger tight To install the needle of various end areas screw the needle shank into the tapped hole in the lower end of the spring barrel assembly 3 Preparation of Specimen Prepare sample in accordance with either ASTM C403 or AASHTO T197 specifications 4 Storage of Specimen Store and maintain the specimen at the desired temperature ...

Страница 4: ... diameters of the needle used but not less than 13mm and at least 1 25mm from the side of the container being used 6 4 Make penetration tests at hourly intervals for normal mixtures and normal temperatures The initial test being made after an elapsed time of 3 to 4 hours In some instances the initial elapsed test times maybe increased or decreased 6 5 Not less than six 6 penetration determinations...

Страница 5: ...catalog on Terms and Conditions of Sale The purchaser is responsible for the transportation charges Humboldt Mfg Co shall not be responsible under this warranty if the goods have been improperly maintained installed operated or the goods have been altered or modified so as to adversely affect the operation use performance or durability or so as to change their intended use The Humboldt Mfg Co liab...

Страница 6: ...Mortar Penetration Resistance Apparatus H 4137 Page 6 of 6 Instruction Manual Rev 0 August 14 2003 Copyright 2003 Humboldt Mfg Co Norridge IL 60706 U S A All rights reserved Printed in U S A ...

Отзывы: