
18
www.humancaregroup.com
Maintenance
The Alzaro is constructed in such a way that maintenance can be kept to a minimum. It is recommend-
ed that the following maintenance scheduled is maintained.
Checklist Prior to Each Use
ü
Battery is fully charged
ü
Sling shows no signs of wear
ü
Plastic components i.e. clips are not
cracked, damaged or worn
ü
Electrical lift and handset functions
checked and working
ü
Brakes hold position when locked
Checklist After Each Use
ü
Clean according to cleaning instructions.
Weekly Maintenance
ü
Check the operation of the lift and the
operation of the emergency stop.
ü
Check that all parts move easily and
without any noise.
ü
Charge the batteries.
Semi-Annual Maintenance
ü
Complete the service checklist. If the lift
does not meet one or more of the checklist
points, it should be temporarily deactivated
from use until such time that it meets the
maintenance criteria.
Annual Maintenance
ü
Once a year, according to ISO 10535, the
lift must be inspected. This inspection must
be done only by qualified and authorized
personnel. Each lift shall have a service control
sticker affixed indicating the date of inspection.
Содержание 11000490
Страница 1: ...Alzaro Part no 11000490 User Manual...