Figure 20: Terminal Initialization Sequence in progress
An activity in progress is indicated by three dots after the name of the activity, for example:
Acquiring Keys...
Note:
Downloading the
commissioning
software, if required, takes approximately 5 minutes.
Do not remove power
during this download because you think it's taking too long. If you
do, you will have to wait until the commissioning software is broadcast again from the
NOCC
plus
the download time. The wait for the software broadcast your router needs can
be as long as 20 to 25 minutes.
Downloading
operational
software takes about 10 to 20 minutes. This download occurs
after the commissioning software download, as shown in
Figure 21: Terminal Initialization
on page 34.
During the initialization sequence, numerous procedures are performed that are critical for
operation of the satellite router. In addition to the procedures listed on the Terminal Initialization
Sequence screen, the satellite router
probes
to optimize its timing and power levels.
Registration
refers to equipment identification, authentication, and registration with the satellite network.
During
configuration reconciliation
, the router makes sure it has the correct configuration. The
router also loads numerous profiles that are required for network operation.
Monitor the commissioning process by viewing the Terminal Initialization Sequence screen.
Unless there is a problem (as indicated by an error message), you should not have to take any
action during this sequence except to monitor the process.
1.
Monitor the commissioning progress messages on the Terminal Initialization Sequence
screen.
When commissioning is complete, the Terminal Initialization Sequence screen shows
Installation Complete
as the last progress message. This message is indicated by the arrow
in
Figure 21: Terminal Initialization Sequence complete
on page 34.
Note:
Some error messages are temporary. For example, you may see a message that
says a commissioning activity is halted; then in a short time the activity resumes.
33
HN9500 Satellite Router Installation Guide
1037736-0001 Revision G
Chapter 5
Commissioning the satellite router
Содержание HN9500
Страница 1: ...1037736 0001 Revision G February 26 2010 HN9500 Satellite Router Installation Guide ...
Страница 10: ......
Страница 14: ......
Страница 20: ......
Страница 40: ......
Страница 70: ......
Страница 78: ......
Страница 110: ......
Страница 120: ......
Страница 132: ......
Страница 136: ...HN9500 Satellite Router Installation Guide 122 1037736 0001 Revision G Index ...