
10
Plumbing Installation Instructions:
IMPORTANT INFORMATION:
•
Ensure all fitting installations comply with local plumbing and building codes.
•
This water heater does not require a temperature and pressure (T&P) relief valve.
You may install a T&P relief valve if the county, city or state plumbing code requires
it.
•
Installations in the Commonwealth of MASSACHUSETTS and KENTUCKY require
a T&P relief valve.
•
It is recommended that this unit be installed in plumbing systems use copper or
stainless steel piping only. If using plastic piping such as PEX or PVC is
required, then contact the Hubbell Heater for more information.
•
WARNING:
DO NOT SOLDER ANY PIPING WHILE THE UNIT IS
CONNECTED TO THE PIPING. DOING SO WILL DAMAGE THE
FLOW METER AND VOID YOUR WARRANTY.
•
Before energizing the heater, run water for a minimum of three (3) minutes and
verify that all air has been removed.
•
Installation of an air separator device is recommended for installations where air can
be easily introduced into the water system (i.e. Well water systems, lake pumps, and
other municipal systems).
•
Shut off valves MUST be installed on both the inlet side and outlet piping of
unit.
•
WARNING
: DO NOT SUPPLY WATER TO THE UNIT THAT IS
HOTTER THAN 130°F.
Flushing the Line:
•
Before connecting the copper pipe to the water heater, it is extremely important to
flush the lines to eliminate all plumbing paste, residue, or debris in the lines and
damaging the flow meter.
•
After completing plumbing installation, open the hot water faucet and allow water
to run through the water heater for at least three (3) minutes, cycling the flow on
and off every minute. This process clears all the air from the lines and must be
performed prior to turning on the power at the unit.
WARNING:
FAILURE
TO DO THIS MAY DAMAGE THE FLOW METER AND/OR HEATING
ELEMENTS AND WILL VOID YOUR WARRANTY.
Checking for Leaks and Purging Air:
•
Verify circuit breakers and service disconnect supplying power to the unit are
turned off.
•
Open all hot water taps supplied by the unit and inspect water connections for leaks.
•
With all hot water taps still open, allow the water to run for a minimum of 3
minutes.
Inspect each tap to ensure all air in the lines has been purged. This process
purges all the air from the water lines and MUST be performed prior to turning on the
power at the unit.
WARNING:
FAILURE TO FOLLOW THIS STEP CAN
CAUSE PERMANENT DAMAGE TO THE HEATING ELEMENTS.
•
Close all hot water taps.
Содержание ETXA Series
Страница 13: ...13 WIRING DIAGRAMS Tankless Wiring Diagram 1B ...
Страница 14: ...14 Tankless Wiring Diagram 1C Delta ...
Страница 15: ...15 Tankless Wiring Diagram 1C Wye ...
Страница 16: ...16 Tankless Wiring Diagram 1F ...
Страница 17: ...17 Tankless Wiring Diagram 1G Delta ...
Страница 18: ...18 Tankless Wiring Diagram 1G Wye ...
Страница 19: ...19 Tankless Wiring Diagram 2C ...
Страница 20: ...20 Tankless Wiring Diagram 2D ...
Страница 21: ...21 Tankless Wiring Diagram 2E Delta ...
Страница 22: ...22 Tankless Wiring Diagram 2E Wye ...
Страница 23: ...23 Tankless Wiring Diagram 2F ...
Страница 24: ...24 Tankless Wiring Diagram 3A Delta ...
Страница 25: ...25 Tankless Wiring Diagram 3A Wye ...
Страница 26: ...26 Tankless Wiring Diagram 3B ...
Страница 32: ...32 Power and Triac Wiring TK2000ControlBoardWiringDetail ...
Страница 33: ...33 TK2250ControlBoardWiringDetail ...
Страница 49: ...49 NOTES ...
Страница 50: ...50 NOTES ...
Страница 51: ...51 NOTES ...