background image

A96473

EPA-T

 

 

7/27/2010

INSTALLATION INSTRUCTIONS

CATALOG NUMBER

PART NO.

APPRVD

DATE

DATE

REV.

16555 East Gale Avenue
City of Industry, CA  91745
(626)968-5666

50W MAXIMUM.

NOTE:

BY OTHERS

MR16 LAMP

(3) S/S SET SCREW

THE MAIN POWER SUPPLY LEADS

AUXILIARY POWER SUPPLY AND PASS

SCREWS. REMOVE HATCH.

4.  LOOSEN (2) HATCH MOUNTING

BUT DO NOT TIGHTEN YET.

ORDER TO ADJUST THE HORIZONTAL

ADAPTER ON POLE TOP IN

8.  ROTATE EGRESS POST TOP

(2) HATCH MOUNTING SCREWS.

POST TOP ADAPTER AND TIGHTEN

SET SCREWS TO SECURE ADAPTER.

LAMP POSITION. TIGHTEN (3) S/S

7.  REPLACE HATCH ON THE EGRESS

TIGHTEN (1) THUMB SCREW.

POSITION TO THE DESIRED LOCATION.

ADJUST THE VERTICAL LAMP

6.  LOOSEN (1) THUMB SCREW AND

GROUNDING WIRE

THUMB SCREW

GROUNDING

EGRESS TENON

ADAPTER WIRE WAY

1.  TURN OFF ALL POWER.

SCREWS

(2) HATCH MOUNTING

HATCH

4" O.D. POLE (REF)

LAMP PROVIDED BY OTHERS.

5.  INSTALL (1) MR16 (50 WATT MAX)

EGRESS TENON. (BY OTHERS)

AND SECURE THE FIXTURE TO THE

FIXTURE OVER THE EGRESS TENON

TOP FIXTURE. PLACE THE POST TOP

MAIN POWER SUPPLY TO THE POST

EGRESS POST TOP ADAPTER TO THE

2.  CONNECT THE LEADS FROM THE

INSTALLATION INSTRUCTIONS:

ADAPTER ON THE POLE TOP

3.  PLACE THE EGRESS POST TOP

THROUGH THE ADAPTER WIREWAY.

9.  CONNECT THE LEADS FROM THE

Отзывы: