MP15 Jockey Pump Controller
3
Publication 245-EN – November 2013
Installation
The controller has been assembled and wired at the factory with the highest
workmanship standards. All wiring and functions have been thoroughly tested to
ensure correct operation when properly installed.
Receiving, Handling, and Storage
1.
Immediately upon receipt, carefully unpack and inspect the controller
for damage that may have occurred in shipment. If damage or rough
handling is evident, file a damage claim with the transportation carrier
immediately.
2.
If the controller must be stored, cover it and then place it in a clean, dry
location. Avoid unheated locations, where condensation can result in
damage to the insulation or corrosion of metal parts.
Precautions
CAUTION
To avoid risk of
SERIOUS INJURY or DEATH
, and to
avoid damage to the controller, READ THIS SECTION
CAREFULLY. If questions or concerns still exist,
contact the Metron factory for further
clarification.
If work must be carried out on the motor or controller, ensure the controller is
ISOLATED AND LOCKED OFF from the AC mains supply before work
commences. Lockout/Tag out procedures should be followed in accordance
with OSHA standard and any local standards that may apply.
During installation and maintenance, to prevent automatic starting of the motor
ensure the controller HOA Switch is in the Off position.
To avoid risk of serious electric shock,
never
energize the controller with the
access door open unless absolutely necessary.
If the access door to the interior of the panel has to be opened when the panel is
energized, take caution that high voltage is present.
Installation Instructions
Mounting
The controller should be mounted using appropriate fixing methods: