background image

1

I.Products Introduction

HZ-8600 Phasing Unit,

for MV overhead distribution circuit,used for detection of

high-voltage power grid closing point on both sides of the phase sequence is the same.

Two power line connection before must check phase sequence, or line may be short

circuit. The instrument suitable for36KV power transmission line, and can test whether line

charged. The Instrument adopts the wireless transmission technology, safe and reliable

operation, easy to use.

II.Working Principle

The instrument consists of two transmitters (x and y) and a receiver. Two emitters can be

judged whether line charged, and launch phase signal. Receiving meter receives two

emitters’ signal, to judge whether the same on both sides phase sequence.

III.Security Matters

1. Insulating rod before using should be voltage withstand test.

2. The standard configuration insulating rod length is 3 m, corresponding voltage for ≤

220 KV. If the measurement circuit voltage higher than 220KV, please use the length of

more than 3 meters of the insulating rod.

3. Operation hand position not more than insulating rod handle position.

IV.Technical Characteristic

1. Accuracy:When phase sequence is same: the error≤ 5 °.

2. The frequency accuracy

±0.1HZ.

3. Measuring voltage range is 36KV .

4. The transmitter and the receiving host transmission distance is more than 130 meters,

the maximum distance between the two transmitters is about 260 meters.

5. Results (in phase, interphase) using A standard, phase difference acuity ≥30 ° for out

phase, the phase difference < 30 ° are in phase.

6. Screen shows two lines at the same time of phase difference, frequency, waveform

and the vector diagram.

7. The host shows battery, half an hour without automatic shutdown operation.

Содержание HZ-8600

Страница 1: ...HZ 8600 Phasing Unit Huazheng Electric Manufacturing Baoding Co Ltd...

Страница 2: ...ate the user must abide by the warning and safety regulations Please read the following instructions before use Warning please carefully read and understand the instruction manual before the use of th...

Страница 3: ...1 III Security Matters 1 IV Technical Characteristic 1 V Introduction Of Instrument 2 VI The Nuclear Phase Operation 5 VII The Test Results Analysis 7 VII Instruments To Check 8 IX Maintenance 9 X Af...

Страница 4: ...1 Insulating rod before using should be voltage withstand test 2 The standard configuration insulating rod length is 3 m corresponding voltage for 220 KV If the measurement circuit voltage higher tha...

Страница 5: ...3 W 12 Host lithium battery capacity is about 2200 mAH transmitter battery capacity is about 350 mAH 14 Working environment temperature 35 45 humidity 95 RH 15 Storage conditions temperature 40 55 hum...

Страница 6: ...rt press the close distance measurement and distance measurement switching Supplement 1 Top right corner have power indicator 2 The bottom jack is charging interface Emitter bottom Lamp Testing Two li...

Страница 7: ...igure 1 Method 2 the emitter hooked up to the corresponding voltage grade of electric circuit inspection as shown in figure 2 or use the high pressure test equipment simulation of high voltage line fo...

Страница 8: ...han 30 degrees are heterogeneous heterogeneous indicator voice prompt phase out please note at the same time Less than 30 degrees are in phase in phase indicator the voice prompt in phase at the same...

Страница 9: ...ltage level instructions Instructions Added 500KV Launcher insulating rod 5 meters the hook on the high tension line directly host boot Conventional 330KV Launcher insulating rod 4 meters the hook on...

Страница 10: ...tchgear induction electric test line VII The Test Results Analysis Phase difference value f The phase difference is stable Results the judgment Added 0 5 Stable In phase Two lines with the frequency S...

Страница 11: ...rger After full charge indicator for the green light The emitter function Use the special test line of mains connection see figure 1 the mains The receiving host boot Buzzer rang 2 seconds the indicat...

Страница 12: ...y the company free replacement new instrument 2 The instrument within one year quality problems by the company free repair 3 The instrument use more than a year the company is responsible for the long...

Страница 13: ...he results of Standard values The test results 6 10 1 5 44 44 1 5 qualified 35 2 4 80 80 1 5 qualified 66 110 2 8 254 254 1 5 qualified 220 3 0 300 300 1 5 qualified Products comply with national GB31...

Страница 14: ...11 7 Charger 2 8 9 Description Tip terminal replacement transmitter head hook When it is suitable for field operation more than hook please replace the hook with it after the operation...

Отзывы: