
22
The input gas must fit for the system gas supply requirements, if use high press gas cylinder supply gas, must choose
good quality gas regulator to ensure the gas pressure stable
When adopt O
2
as the plasma gas, there is risk for fire, so exhaust ventilation system must be installed, after
installation, must check if there is any leak
Gas type
For different cutting material adopts different gas
Material
Plasma gas
Shield gas
C.S
Air
Air
O
2
Air
S.S or Al.
Air
Air
N
2
N
2
N
2
Air
Air/Air cutting, gas hose connect
When connect Air/Air, only need connect
○
16 and
○
17, connect compressed air to plasma and shield gas regulator filter,
no need N
2
or O
2
N
2
/N
2
cutting, gas hose connect
When connect Air/Air, only need connect
○
16 and
○
17, connect compressed air to plasma and shield gas regulator filter,
no need Air or O
2
O
2
/Air cutting, gas hose connect
When adopt O
2
as the plasma gas, Air as the shield gas, gas hose connect as:
Plasma gas hose connection:
○
18 shield gas hose, take off from the plasma gas inlet terminal from back of the machine,
then connect the filtered and flow adjusted O
2
(the O
2
gas hose should be out diameter 10mm soft hose),customer need
prepare good quality O
2
gas regulator instead of the gas filter at back of the machine to ensure safety.
Shield gas hose connection:
○
16 shield gas hose, connect compressed air to the shield gas regulator inlet connector.
No need N
2
11. Filling coolant liquid
Improper coolant will cause damage for the machine
Please refer to the coolant requirements
Coolant capacity of the cooling system is 20 liters, the specific capacity depends on the length of the integrated cable.
Firstly, pour coolant into power until the bucket is filled. Power indicator of cutting power panel and liquid level
indicator should be on; water pump in cutting power supply starts to work, then the liquid flow indicator is lit. (If the cable
length is longer (more than 50 meters), the cooling fluid level will decrease and panel liquid level indicator will be
extinguished after the pump works for a while, then the water pump stops working. In this case, please turn off the power,
fill cooling liquid into the bucket again, and turn on power supply until the coolant flow is normal, panel liquid flow indicator
is lit.
Finally, turn off the power; fill the cooling fluid into the bucket and cover bucket.
12. Setting of gas supply
Start the gas supply equipment, open the gas supply switch. Turn on the power, the pressure indicator of cutting power
panel should be lighted. If the pressure is less than 0.2Mpa, the air pressure indicator will not be lighted, need to check the
gas supply.
Place the gas control switch to "check gas" position, adjust the plasma gas and protecting gas pressure to make the
output pressure or flow satisfy cutting requirements (please see the cutting table for regulated value), after adjustment,
Содержание SLG-200HF
Страница 1: ...SLG 200 300 400HF PLASMA CUTTING MACHINE MANUAL INSTRUCTION PLEASE READ IT CAREFULLY BEFORE OPERATION...
Страница 12: ...5 3 2 SLG 300HF dimension and weight 3 3 SLG 400HF dimension and weight...
Страница 22: ...15 5 2 Installation Drawing System components A Plasma power sourceSLG 200HF 300HF 400HF...
Страница 47: ...40 3 Circuit diagram 7 1 SLG 200HF...
Страница 48: ...41 7 2 SLG 300HF...
Страница 49: ...42 7 3 SLG 400HF...
Страница 50: ...43 7 4 QFK E1...