
UPS5000-S-880 kVA
User Manual (CMI)
3 Installation
Issue 02 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
65
3.2.3.6 Installing a Battery Grounding Failure Detector
Procedure
Step 1
Install a battery grounding failure detector.
For details, see
UPS Battery Grounding Failure Detector User Manual
.
Figure 3-20
Position of a battery grounding failure detector in the UPS
(1) Battery grounding failure detector
----End
3.2.3.7 Connecting the iBAT
Procedure
Step 1
Connect the COM_OUT port on the CIM of the iBAT to the COM2 port on the monitoring
interface card.