UPS5000-S-880 kVA
User Manual (CMI)
3 Installation
Issue 02 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
62
Procedure
Step 1
Install a battery rack and batteries.
For details, see the battery installation guide delivered along with batteries.
----End
3.2.3 Installing Optional Components
3.2.3.1 Installing Antiseismic Kits
Install antiseismic kits only when the cabinet is floor-mounted.
Step 1
Mark mounting holes on the ground based on the marking-off templates.
Figure 3-16
The following figure shows the dimensions of antiseismic kit mounting holes.
Step 2
Drill holes for installing expansion bolts, and install expansion sleeve.
Step 3
Open the front door of the cabinet, remove the support baffle plates from the front of the
cabinet, and remove the rear cover plate.
Step 4
Secure the antiseismic kits to the front and back of the cabinet using M6 screws. The
tightening torque is 3 N·m.
Step 5
Adjust the cabinet to ensure that the expansion bolt holes align with the half holes below.
Step 6
Use expansion bolts to firmly lock the front and rear antiseismic kits to the ground.
Step 7
Reinstall the support baffle plates and rear covers.
Step 8
Install the front, rear, left, and right anchor baffle plates.
----End