7.7.1 Lead-Acid Battery Test
7.7.1.1 Performing a Forced Equalized Charging Test
Context
This item allows you to perform equalized charging on batteries forcibly.
NO TICE
Before performing a forced equalized charging test, ensure that:
● The mains input is normal.
● Batteries are properly connected.
● Batteries are not in equalized charging mode.
Procedure
Step 1 On the home screen of the LCD, choose System Info > Maintenance > Battery
Maint.
Step 2 Tap Start on the right of Forced Equalized Charging to start a forced equalized
charging test.
Figure 7-14 Starting a forced equalized charging test
NO TE
The forced equalized charging test automatically stops in any of the following cases:
● The test duration reaches the forced equalized charging protection time (12–24 h, 18 h
by default).
● The UPS generates a battery overtemperature, overvoltage, or overcurrent alarm.
● An alarm is generated.
----End