Figure 6-11 Recommended channel steel dimensions (unit: mm)
6.3.1.2 Installing Cables
Context
NO TE
The number and colors of cables in the figures are for reference only.
Procedure
Step 1 Open the front door of the cabinet, remove the power distribution cover, and
remove the top cover as required.
Figure 6-12 Removing the covers
Step 2 Install ground cables.
UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Module)
6 Installation
Issue 02 (2021-04-22)
Copyright © Huawei Technologies Co., Ltd.
71