UPS5000-H-1200 kVA
User Manual (100 kVA Power Modules)
5 Operations
Issue 01 (2020-07-15)
Copyright © Huawei Technologies Co., Ltd.
145
5.6.1.2 Performing a Shallow Discharge Test
Before performing a shallow discharge test, ensure that:
The UPS works in normal mode with a load rate fluctuation less than 10%.
The UPS generates no battery overtemperature, overvoltage, or overcurrent alarm. No
generator is connected to the UPS.
The mains, batteries, charger, and discharger are normal. No overload alarm is generated.
Automatic Shallow Discharge Test
Step 1
On the home screen of the LCD, choose
System Info
>
Settings
>
Battery Settings
and set
Sched. shallow dis. test
to
Enable
.
Step 2
Set
Sched. shallow dis. test time
and
Sched. shallow dis. test interval
as required. After
setting is complete, the system will perform an automatic shallow discharge test based on the
settings.
----End
Manual Shallow Discharge Test
Step 1
On the home screen of the LCD, choose
System Info
>
Maintenance
>
Battery Maint.
Step 2
Tap
Start
on the right of
Shallow Dis. Test
to start a shallow discharge test.
Figure 5-10
Starting a shallow discharge test
When the battery test is completed normally, the test data is used as common test data. Record the data
obtained from the latest five tests.
The shallow discharge test automatically stops in any of the following cases:
The battery discharge capacity reaches the specified value (10%–50%, 20% by default).
The discharge voltage reaches the warning threshold (calculated in real time).
The load rate fluctuation exceeds 10%.