Huawei UPS2000-H-6 kVA Скачать руководство пользователя страница 1

Lithium battery

(3 U)

Reserved space

(1 U)

10 kVA UPS

(2 U)

UPS2000-H-(6 kVA

10 kVA) Quick Guide

01

Installation Preparations

Model

Weight

Dimensions (H x W x D)

UPS2000-H-6KRTL-Li

14 kg

43 mm x 430 mm x 514 mm

UPS2000-H-10KRTL-Li

17 kg

86 mm x 430 mm x 514 mm

Issue: 02
Date: 2021-10-13

1.

Before installing the devices, read the user manual carefully to get familiar with product information and safety precautions.

2.

Use insulated tools during installation.

3.

Only engineers certified by Huawei or its agents are allowed to install, commission, and maintain the UPS. Otherwise, personal injury or equipment damage may occur, and the UPS faults 
caused are beyond the warranty scope of Huawei.

4.

When routing power cables and communications cables, prevent cables from being scratched by cabinet components.

1

Unit: mm

6 kVA UPS

(1 U)

Lithium battery

(3 U)

Reserved space

(1 U)

UPS Dimensions and Space Planning (6 kVA)

Rack-mounted

Tower-mounted

T/H sensor

Ethernet

SNMP

User equipment

Dry Contact Card

Model

Wiring Terminal

Number 
of Phases

Rated Voltage

External Circuit 
Breaker

Cable Cross-sectional 
Area

Terminal Type

Note

6 kVA (single-
phase input 
single-phase 
output)

AC input

L/N/PE

1

220 V AC/230 V 
AC/240 V AC

50 A (feature C)

10 mm

2

OT-10 mm

2

-M6 terminal

M4 screw tightening torque

1.2 N·m

Torque for tightening screws

: 4.8 N·m

Notes:

Use flexible conductors with a working 
temperature of 90

or softer conductors 

for power cables. Cables with solid 
conductors or twisted conductors may fail 
to be installed.

If there is no battery bus bar (BBB) box, 
connect battery cables to the UPS. Select OT 
terminals based on the battery cables.

a: The lithium battery is equipped with a 
circuit breaker.

b: In bypass mode, the UPS obtains power 
from phase A. The input current is the 
three-phase total current.

AC output

L/N/PE

1

40 A (feature D)

6 mm

2

OT-6 mm

2

-M6 terminal

Battery 

+

2

54 V DC

160 A

a

2 x 25 mm

2

OT-25 mm

2

-M6 terminal

-

2 x 25 mm

2

PE

-

2 x 6 mm

2

OT-6 mm

2

-90

°

bending-M4 

terminal

10 kVA (single-
phase input 
single-phase 
output)

AC input

L/N/PE

1

220 V AC/230 V 
AC/240 V AC

80 A (feature C)

16 mm

2

OT-16 mm

2

-M6 terminal

AC output

L/N/PE

1

63 A (feature D)

16 mm

2

OT-16 mm

2

-M6 terminal

Battery 

+

2

54 V DC

250 A

a

2 x 35 mm

2

OT-35 mm

2

-M6 terminal

-

2 x 35 mm

2

-

PE

2 x 6 mm

2

OT-6 mm

2

-M6 terminal

10 kVA (three-
phase input 
single-phase 
output)

AC input

L/N/PE

3

380 V AC/400 V 
AC/415 V AC

80 A

b

(feature C)

16 mm

2

OT-16 mm

2

-M6 terminal

AC output

L/N/PE

1

63 A (feature D)

16 mm

2

OT-16 mm

2

-M6 terminal

Battery 

+

2

54 V DC

250 A

a

2 x 35 mm

2

OT-35 mm

2

-M6 terminal

-

2 x 35 mm

2

PE

-

2 x 6 mm

2

OT-6 mm

2

-M6 terminal

Lithium battery

+

2

54 V DC

-

25 m

2

OT-25 mm

2

-M6 terminal

-

25 mm

2

PE

6 mm

2

OT-6 mm

2

-M6 terminal

Unit: mm

Rack-mounted

Tower-mounted

UPS Dimensions and Space Planning (10 kVA)

02

Installing a UPS

Installing Optional Components

6 kVA UPS

(1 U)

Lithium battery

(3 U)

Subrack

Lithium battery

(3 U)

10 kVA UPS

(2 U)

Subrack

The 4G module is 
connected to the USB 
port of the SNMP card 
through a USB 
extension cable. The 
4G module is magnetic 
and can be mounted 
to the near cabinet.

4G Module

Installing Mounting Ears

Installing Guide Rails

install four floating nuts.

Typical Rack-mounted Scenario

Connect cables to the lower 
UPS and then to the upper 
UPS.

The installation of the 6 kVA UPS is similar to that of the 
10 kVA UPS. This document uses the 6 kVA UPS as an 
example. Perform operations based on the actual 
situation.

A UPS supports a maximum of eight lithium batteries in 
parallel.

It is recommended that the BBB box be installed behind 
the lithium batteries.

If four groups of batteries are installed in the rack-
mounted mode, reserve 1 U space between each two 
groups of lithium batteries for battery cables.

You are advised to reserve 1 U space between UPSs, 1 U 
space between the UPS and lithium battery, and 1 U space 
above the UPS.

The following uses two 6 kVA UPSs and 
two lithium batteries in rack-mounted 
mode without a junction box as an 
example.

If the build-out resistor is not installed, 
the communication between the UPS 
and batteries will fail.

Securing the UPS and Lithium batteries. 

Connect the COM port on 
the UPS to the COM_IN 
port on the lithium battery.

Содержание UPS2000-H-6 kVA

Страница 1: ...VA single phase input single phase output AC input L N PE 1 220 V AC 230 V AC 240 V AC 80 A feature C 16 mm2 OT 16 mm2 M6 terminal AC output L N PE 1 63 A feature D 16 mm2 OT 16 mm2 M6 terminal Battery 2 54 V DC 250 Aa 2 x 35 mm2 OT 35 mm2 M6 terminal 2 x 35 mm2 PE 2 x 6 mm2 OT 6 mm2 M6 terminal 10 kVA three phase input single phase output AC input L N PE 3 380 V AC 400 V AC 415 V AC 80 Ab feature...

Страница 2: ...nect loads to AC OUTPUT sL and pL terminals Connect primary loads to the sL terminal and secondary loads to the pL terminal 6 K1 UPS input circuit breaker Q1 UPS output circuit breaker When replacing a faulty lithium battery disconnect all loops between the UPS and the battery to prevent maintenance with power on Installing Cables 2 Typical Tower mounted Scenario Rear view Front view Secure the up...

Страница 3: ...50 Hz 60 Hz 11 The positive and negative voltages of the lithium battery measured by a multimeter ranges from 41 V to 51 V 04 Verifying the Installation 6 kVA Single Phase Input Single Phase Output 10 kVA Single Phase Input Single Phase Output 10 kVA Three Phase Input Single Phase Output 1 Ensure that the AC input and output power cables on each UPS are connected in the same phase sequence battery...

Страница 4: ...lly delivered and the inverter indicator is steady on the UPS enters normal mode Choose Configuration Control Power on off on the app to start the inverter After successful startup the UPS enters normal mode For details about how to install and log in to the app see the Appendix On the WebUI choose Monitoring UPS System Running Control to start the UPS 5 When the UPS runs properly switch on the UP...

Отзывы: