Table 3-5 Post-installation check items
No.
Item
Expected Result
1
Cable routing
Cables are routed properly according
to engineering requirements.
2
Cable connections
Input cables, output cables, and
battery cables are tightened to
specified torques using a torque
wrench, connected correctly, and free
of damage.
3
Cable connections for USB
ports and network ports
Cables to USB ports and network ports
are connected correctly and securely.
4
Labels
Labels are neatly attached to both
ends of each cable, and the
information on the labels is concise
and understandable.
5
Ground cable connections
The ground cable is securely connected
to the equipment room ground bar.
Measure the resistance between the
UPS ground cable and the equipment
room ground bar, which must be less
than 0.1 ohm.
6
Distances between cable ties
Distances between cable ties are the
same, and no burr exists.
7
Operating environment
Clean the conductive air and other
sundries.
8
Cables short circuit
Check that cables are open-circuited
using a multimeter or an insulation
resistance tester.
9
Circuit breaker specifications
AC input circuit breaker specifications
of the equipment room ≥ Circuit
breaker specifications of the AC PDB ≥
AC input circuit breaker specifications
of the UPS
10
Positive and negative battery
voltage range
The positive and negative battery
voltages range from 200 V to 280 V
(measured using a multimeter).