SUN2000-63KTL-JPH0
User Manual
5 Electrical Connections
Issue 04 (2019-06-30)
Copyright © Huawei Technologies Co., Ltd.
43
Figure 5-7
AC terminal block dimensions
This document introduces how to install the four-core AC output power cable, which can be a reference
for installing the three-core cable. The three-core cable does not need a PE cable installed in the
maintenance compartment.
Procedure
Step 1
Remove the sealing nut and rubber liner from the cable gland.
Step 2
Select an appropriate rubber liner based on the cable outer diameter.
Step 3
Make the cable and crimp the OT/DT terminal.
Step 4
Route the cable through the cable gland.
Step 5
Secure the AC output power cable and PE cable.
Step 6
Tighten the cable gland.