SUN2000-4.95KTL-JPL0
User Manual
4 Installation
Issue 03 (2020-06-03)
Copyright © Huawei Technologies Co., Ltd.
16
4
Installation
4.1 Checking Before Installation
Outer Packing Materials
Before unpacking the solar inverter, check the outer packing materials for damage, such as
holes and cracks, and check the solar inverter model. If any damage is found or the solar
inverter model is not what you requested, do not unpack the package and contact your dealer
as soon as possible.
You are advised to remove the packing materials within 24 hours before installing the solar
inverter.
Package Contents
After unpacking the solar inverter, check that the contents are intact and complete. If any
damage is found or any component is missing, contact your dealer.
For details about the number of accessories delivered with the solar inverter, see the
Packing List
in the
packing case.