Huawei SUN2000-3KTL-10KTL-M0 Скачать руководство пользователя страница 1

SUN2000-(3KTL-10KTL)-M0

Quick Guide

Issue: 07
Part Number: 31509649
Date: 2019-10-28

HUAWEI TECHNOLOGIES CO., LTD.

Содержание SUN2000-3KTL-10KTL-M0

Страница 1: ...SUN2000 3KTL 10KTL M0 Quick Guide Issue 07 Part Number 31509649 Date 2019 10 28 HUAWEI TECHNOLOGIES CO LTD ...

Страница 2: ...system and local regulations 4 Before installing the device check that the package contents are intact and complete against the packing list If any damage is found or any component is missing contact your dealer 5 Use insulating tools when installing the device For personal safety wear proper personal protective equipment PPE 6 Huawei shall not be liable for any consequences caused by the violatio...

Страница 3: ...2 Dimensions Tilt and Space 2 Installing the Device Installation Requirements 2 1 Two M6 screw holes are reserved on both left and right sides of the inverter for installing an awning ...

Страница 4: ...ount of the bolts do not meet installation requirements prepare M6 stainless steel expansion bolts by yourself The expansion bolts delivered with the inverter are used for solid concrete walls For other types of walls prepare bolts by yourself and ensure that the wall meets the load bearing requirements of the inverter Loosen the nuts flat washers and spring washers of the two expansion bolts belo...

Страница 5: ...ecommended model PV1 F Conductor cross sectional area 4 6 mm2 Cable outer diameter 4 5 7 8 mm 4 Optional RS485 communications cable used to cascade inverters or connect to the RS485 signal port on the SmartLogger Two core outdoor shielded twisted pair cable Conductor cross sectional area 0 2 1 mm2 Cable outer diameter 4 11 mm 5 Optional RS485 communications cable used to connect to the RS485 signa...

Страница 6: ... cable is connected Installing the PE Cable 3 2 Do not connect the neutral wire to the enclosure as a PE cable Otherwise electric shocks may occur Ensure that the protection layer of the AC output power cable is inside the connector the core wires are totally inserted into the cable hole and the cable is connected securely Failing to do so may cause device malfunction or damage Installing the AC O...

Страница 7: ...6 1 Connect the AC output power cable to the AC connector Three core cable L1 L2 and L3 Click Four core cable L1 L2 L3 and PE Click Four core cable L1 L2 L3 and N Click ...

Страница 8: ...7 Five core cable L1 L2 L3 N and PE Click AC output port AC 2 Connect the AC connector to the AC output port 3 Check the route of the AC output power cable ...

Страница 9: ...d 4 The DC input voltage of the SUN2000 shall not exceed 1100 V DC under any circumstance 5 Before installing the DC input power cable label the cable polarities to ensure correct cable connections 6 If the DC input power cable is reversely connected do not operate the DC switch as well as positive and negative connectors immediately Failing to do so may cause device damage which is not covered un...

Страница 10: ...inals Positive connector Negative connector Positive metal terminal Negative metal terminal Ensure that the cable cannot be pulled out after being crimped Ensure that the locking nut is secured Ensure that the cables are correctly connected The DC voltage of a multimeter should not be less than 1100 V Click ...

Страница 11: ...r 0 2s and then off for 0 2s The parameters for connecting to the router are to be set Green Blinking at long intervals on for 0 5s and then off for 0 5s Connecting to the router Green Steady on Successfully connected to the management system Green Blinking at short intervals on for 0 2s and then off for 0 2s The inverter is communicating with the management system through the Dongle Inverter USB ...

Страница 12: ...on Function Description Pin Definition Function Description 1 485A1 1 RS485A RS485 differential signal Used to cascade inverters or connect to the RS485 signal port on the SmartLogger 2 485A1 2 RS485A RS485 differential signal Used to cascade inverters or connect to the RS485 signal port on the SmartLogger 3 485B1 1 RS485B RS485 differential signal 4 485B1 2 RS485B RS485 differential signal 5 PE S...

Страница 13: ...rtLogger1000A cannot be connected The Smart Power Sensor is necessary for export limitation Only the DTSU666 H Smart Power Sensor provided by Huawei can be used In the SmartLogger1000A networking scenario the Smart Dongle cannot be connected A maximum of 80 devices can connect to a single SmartLogger1000A such as inverters Smart Power sensor and EMI You are advised to connect fewer than 30 devices...

Страница 14: ...unication port COM Optional Installing the RS485 Communications Cable Inverter Cascading 1 Connect the signal cable to the signal cable connector 2 Connect the signal cable connector to the Communication port ...

Страница 15: ...he signal cable to the signal cable connector 2 Connect the signal cable connector to the Communication port Communication port COM Optional Installing the RS485 Communications Cable Only Smart Power Sensor Connected ...

Страница 16: ...able to the signal cable connector 2 Connect the signal cable connector to the Communication port Communication port COM Optional Installing the RS485 Communications Cable Smart Power Sensor and Energy Storage Device Connected ...

Страница 17: ... Connect the signal cable to the signal cable connector 2 Connect the signal cable connector to the Communication port Optional Installing the Grid Scheduling Dry Contact Signal Cable Communication port COM ...

Страница 18: ...e locked by watertight caps 9 The installation space is proper and the installation environment is clean and tidy 4 Verifying Installation 5 Powering On the System Before turning on the AC switch between the SUN2000 and the power grid check that the AC voltage is within the specified range using a multimeter Blinking at Long Intervals On for 1s and then Off for 1s Blinking at Short Intervals On fo...

Страница 19: ...oid App Store iOS Android In areas such as the UK where the FusionSolar app is not available or when a third party management system is used only the SUN2000 app can be used for commissioning This document uses the FusionSolar app as an example to describe the commissioning method For the SUN2000 app perform operations as required Search for SUN2000 in Huawei AppGallery download the latest install...

Страница 20: ...tion If you have an installer account skip this step Creating the first installer account will generate a domain named after the company To create multiple installer accounts for the same company log in to the FusionSolar app and tap New User ...

Страница 21: ...unt for User 1 Access Device commissioning Scenario 2 SmartLogger1000A Networking Scenario 6 2 Scenario 3 FusionSolar App Cannot Access the Internet 6 3 See the Distributed PV Plants Connecting to Huawei Hosting Cloud Quick Guide Distributed Inverters SmartLogger1000A RS485 Networking You can scan the QR code to obtain it ...

Страница 22: ... Use the initial password upon first power on and change it immediately after login To ensure account security change the password periodically and keep the new password in mind Not changing the initial password may cause password disclosure A password left unchanged for a long period of time may be stolen or cracked If a password is lost devices cannot be accessed In these cases the user is liabl...

Страница 23: ... Japan Japan_ESC ms huawei com 0120258367 India India indiaenterprise_TAC huawei com 1800 103 8009 South Korea South Korea Japan_ESC ms huawei com North America USA na_inverter_support huawei com 1 877 948 2934 Canada na_inverter_support huawei com 1 855 482 9343 Latin America Mexico la_inverter_support huawei com 018007703456 0052 442 4288288 Argentina 0 8009993456 Brazil 0 8005953456 Chile 80020...

Страница 24: ...Huawei Technologies Co Ltd Huawei Industrial Base Bantian Longgang Shenzhen 518129 People s Republic of China solar huawei com ...

Отзывы: