background image

1

Issue: 02
Part Number:  31500DAE
Date:  2020-03-23

SmartLi-80Ah Quick Guide

Copyright © Huawei Technologies Co., Ltd. 2020. All rights reserved.

1

Overview

Model

Capacity

Weight

Dimensions  (H x W x D)

Configuration  type

SmartLi-512V-80AH-
F-01

80 Ah

< 800 kg

2000 mm x 600 mm x 
850 mm

With an LCD

(master  cabinet)

SmartLi-512V-80AH-
S-01

Without an LCD  
(slave  cabinet)

Front View

Rear View

End pressure  gauge

Battery  circuit breaker

Monitoring  interface  unit

Battery  monitor  unit 

Battery  module

MDU

Auxiliary
wrench

Fire-trace 

tube

Fire 

cylinder

Fuse

1. Before  installation,  read  the user manual  carefully  to get  familiar  with product  information  and 

safety  precautions.

2. Use insulated  tools  during installation  and  operation.
3. Only Huawei  engineers  or engineers  certified  by Huawei  are  allowed  to install,  commission,  and 

maintain  the battery  cabinet.  Otherwise,  personal  injury  or equipment  damage  may  occur, and 
the resulting  battery  cabinet  faults are  beyond  the warranty  scope  of Huawei.

4. This document  describes  how  to install  a single battery  cabinet.  For details  about  how  to install 

parallel  systems,  contact  Huawei  technical  support.

Содержание SmartLi-512V-80AHF-01

Страница 1: ...nit Battery module MDU Auxiliary wrench Fire trace tube Fire cylinder Fuse 1 Before installation read the user manual carefully to get familiar with product information and safety precautions 2 Use insulated tools during installation and operation 3 Only Huawei engineers or engineers certified by Huawei are allowed to install commission and maintain the battery cabinet Otherwise personal injury or...

Страница 2: ...he fire cylinder upright Ensure that the front of the pressure gauge faces the right side of the cabinet as shown in the figure and that the cylinder does not interfere with the battery trays and the rear cover of the cabinet 6 Install the fire cylinder In the process of assembling and filling please pay attention that the valve container and other parts should keep clean and not polluted This fil...

Страница 3: ...e connection nut to 7 N m using an adjustable torque wrench 8 Remove the valve positioning kit open the valve reinstall the positioning kit and secure it 10 Check the end pressure gauge on the front of the cabinet The pointer should be in the green zone and the pressure reading should be greater than 1 6 Mpa at 20 Record the reading of the pressure gauge 8 hours later observe the pressure gauge ag...

Страница 4: ...xpansion bolts into the expansion bolt holes in the floor and tighten the expansion bolts 2 Use a hammer drill to drill four holes for installing expansion bolts and then install four expansion bolts in the holes Remove the bolt spring washer and flat washer Secured Installation 1 Lower the four leveling feet at the bottom of the cabinet by using a wrench until all the four castors at the bottom h...

Страница 5: ...le Connection Reference Cable Connection Reference 4 1 Prepare cables away from the cabinets to prevent scraps from falling inside Cable scraps may ignite and cause personal injury or device damage After cables have been installed clean the cabinets in a timely manner Keep the cabinets and surrounding environment clean and tidy You need to prepare terminals onsite The stripped length of the copper...

Страница 6: ...ve the cover from the top of the cabinet based on the cable route and cable dimensions Installing a Ground Cable 4 2 The cabling route is for reference only Connect cables based on site requirements 3 Connect the ground cable Site ground bar ...

Страница 7: ...o right to prevent falling over due to imbalance Two persons are required to install the battery modules Place the front cover properly to prevent the light pipe from falling off Installing Battery Modules and Cables 4 3 2 Install battery modules Full capacity Cabinet Configuration Half capacity Cabinet Configuration ...

Страница 8: ... 4 Install battery communications cables a Install communications cables between battery modules b Connect communications cables reserved in the cabinet between the battery modules and the battery monitor unit Full capacity Cabinet Configuration Half capacity Cabinet Configuration ...

Страница 9: ...e the terminal protective covers c Open the terminal protective covers install the battery cables reserved in the cabinet and close the terminal protective covers During installation wear insulation gloves and use insulated tools Connect the round hole of the copper bar to the upper battery module and then connect the waist hole of the copper bar to the lower battery module Excessive bolts will be...

Страница 10: ...10 7 Reinstall the battery monitor unit Connect power cables to the UPS Installing Output Cables 4 4 Without a BBB BOX With a BBB BOX The following uses the UPS with a neutral wire as an example ...

Страница 11: ...UPS Single Cabinet The numbers of cabinets in a parallel system depend on the connection of control cables After the control cables are connected according to the preceding figure the cabinets are numbered 1 2 3 4 and 5 from top to bottom Parallel System for Example Five Cabinets ...

Страница 12: ... After the battery circuit breaker is closed the alarm is automatically cleared After the battery monitor unit is started the green indicator is on for 1s and then off for 4s If multiple SmartLi cabinets are combined press and hold the POWER ON OFF button on the battery monitor unit of the master cabinet for more than 2 seconds to power on the master cabinet Then power on slave cabinets one by one...

Страница 13: ... Specifies the total number of combined cabinets 1 1 8 EPO enable EPO emergency power off is performed only when this parameter is enabled and the EPO switch is triggered When EPO detection is changed from Disable to Enable check that the EPO cable is connected correctly Disable Disable Enable Battery cabinet copper bar over temp enable If this parameter is set to Enable an alarm is reported when ...

Страница 14: ...artLi cabinets one by one Press and hold down the POWER ON OFF button on the battery monitor unit for at least 5 seconds Perform this operation for multiple SmartLi cabinets one by one In this case the green indicators of all battery monitor units are on for 1s and then off for 4s you cannot turn on the battery circuit breakers on other SmartLi cabinets or start the UPS in cold mode 1 If the green...

Страница 15: ...China www huawei com Scan here for more documents You can also log in to Huawei technical support website https support huawei com enterprise https support huawei com Support Support E WeChat Scan here for technical support enterprise Scan here for technical support carrier Huawei App Store Huawei App Store ...

Отзывы: