Figure 8-19
Installing an RRU AISG multi-wire cable
3.
Use an M3 Phillips screwdriver to tighten the posts on both sides of the waterproof
DB9 connector to 0.4 N·m (3.54 lbf·in.).
4.
Connect the other end of the cable to the standard AISG male connector on the RCU.
5.
Route the cables according to the instructions in
, and then
use cable ties to bind the cables.
6.
Label the installed cables according to the instructions in Attaching an L-Shaped
Label.
l
Install an AISG multi-wire cable that is configured with an AISG extension cable.
1.
Use an M3 flat-head screwdriver to loosen the screws on the dustproof cap on the RET
port and remove the dustproof cap.
2.
Link the waterproofed DB9 connector at one end of the AISG multi-wire cable to the
RET port on the RRU bottom, and link the other end to the standard AISG male
connector of the AISG extension cable, as shown in
.
8 Installing RRU Cables
Issue ()
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
105
Содержание RRU3971
Страница 1: ...Issue Date HUAWEI TECHNOLOGIES CO LTD ...