Appendix
48/49 >>
Powering on the OAU 2F (DC)
Using the Web LCT to Load NE Data
NMS port
1
2
USB port
WLAN module
1
2
21
System indicator
Use the Web LCT to configure NE data. For details, see the
Commissioning and Configuration Guide
.
Use the Web LCT to configure NE data. For details, see the
Commissioning and Configuration Guide
.
Connect the Web LCT to the equipment through WLAN. For
information about how to connect the Web LCT to the equipment
through WLAN, see the C
ommissioning and Configuration Guide.
Connect the computer where the Web LCT is installed to
the RJ45 port.
Before powering on the equipment, ensure that:
The P&E cable and the PI power cable are installed.
Power on the equipment within 24 hours of unpacking.
During maintenance, the power-off time of the equipment cannot be
longer than 24 hours.
In normal conditions, the system indicator is on. For a description of
indicator states, see the
Product Description
.
The OAU 2F supports use of a network cable to directly connect the NMS port to the Web LCT. It also supports use of a WLAN module to connect to the Web LCT.