Страница 1: ...HUAWEI TECHNOLOGIES CO LTD OptiX PTN 910E F Packet Transport Platform of PTN Series Quick Installation Guide Issue 04 Date 2020 03 31 ...

Страница 2: ... and features described in this document may not be within the purchase scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS IS without warranties guarantees or representations of any kind either express or implied The information in this document is subject to change without notice Every effort has been...

Страница 3: ...x can moderately improve the device operating environment If you need to use an outdoor cabinet other than the IMB network box for the PTN 910E F contact Huawei to determine whether the outdoor cabinet meets requirements of Huawei devices on the device operating environments Pre Installation Check Before installation check whether the installation environment and accessories meet installation requ...

Страница 4: ...n Gently coil excess optical fibers Do not forcibly bend the optical fibers Do not power on the device when installing and laying out cables FE GE optical interface Power supply interface External clock interface XGE optical interface ESD wrist strap Time interface ETH OAM interface Equipotential bonding point Boolean interface When the PTN 910E F operates switches of two AC power modules in 1 1 b...

Страница 5: ...stalling the PGND cable There are holes for ground screws on the column of the cabinet One end of the PGND cable is fastened to the device and the other end can be fastened to the nearest grounding point or to the indoor ground bar according to the actual situation NOTE Tightening the floating nut a Installing the chassis in the rack b 1 4 0 14 N M M4 Align mounting ears with mounting holes of flo...

Страница 6: ...ounting ear 1U Installing the chassis c Installing the PGND cable d Align mounting ears with mounting holes of floating nuts and screw the chassis Reserve at least 1 U vertical space above and below the chassis for heat dissipation NOTE 2 0 0 2 N M M6 1 4 0 14 N M M4 M6 combination screws with spring and flat washers Take ground screws out of the fitting bat to install the PGND cable There are hol...

Страница 7: ...reventing the plug from getting loose or falling off When laying out power cables ensure that power cables are separated from other cables E1 cable optical fiber and network cable Generally power cables are laid out on the left and signal cables are laid out on the right Two AC power supply modules must be installed on the PTN 910E F NOTE Screw the OT terminal of the DC power cable to the DC power...

Страница 8: ... of cables When installing cables place power cables towards the left and signal cables towards the right 1 2 2 光纤 网管网线 1 When installing or maintaining optical fibers do not look into the optical port without eye protection See Figure 1 When laying out optical fibers take proper measures to avoid any damage to fiber connectors After optical fibers are installed place protective caps on the idle o...

Страница 9: ...optical fibers from being cut Do not use an open end corrugated pipe to hold excessive optical fibers It is recommended that an open end corrugated pipe that has a diameter of 32 mm accommodates 60 optical fibers at most each with a diameter of 2 mm Ensure that about 10 cm of the open end corrugated pipe is inside the cabinet ...

Страница 10: ... points 3 6 1 4 5 2 7 8 and G turn on at the same time Side B Side A You can also use the method of looping back Ethernet interfaces applicable to the Ethernet interfaces on a device that is powered on to check the connectivity of network cables That is connect two Ethernet interfaces using the network cable to be tested If the LINK indicator is on the network cable is normal a Checking the connec...

Страница 11: ...tside the cabinet based on the following requirements Cables are laid out neatly without crossing If a cable ladder is used fasten the cables neatly on the beam of the cable ladder If the distance between the cable tray and the cabinet top is greater than 0 8 m install the cable ladder at the top of the cable tray to reduce the stress generated by the weight of the cables 11 Cables are bent smooth...

Страница 12: ...evice subrack That is one circuit breaker in the EoS outputs one channel of power supply which is provided to only one device instead of multiple devices If one circuit breaker in the EoS corresponds to multiple devices and the overcurrent fault occurs on a device the circuit breaker may perform the protection operation As a result multiple devices are powered off Maximum Working Current Recommend...

Страница 13: ...r output is faulty STAT Green 1 The board is working properly 2 The database is successfully erased by setting the RST button Blink every 200 ms green The database is being erased by setting the RST button Blink every 500 ms green The software of the board is initialized Red 1 A hardware fault occurs on the board 2 The database fails to be erased by setting the RST button Off 1 The board is not wo...

Страница 14: ...ocess the deviation should be less than 2 dB When an optical power meter is used during a test it is recommended that you record the actual transmit optical power of each optical interface and check whether the transmit optical power is normal Consult the project supervisor or software engineer and determine whether it is necessary to test the receive optical power using an optical power meter to ...

Страница 15: ...onductor and the value of L Heat shrink tubing and bare crimp terminal Peeling a power cable Crimping the joint parts of the bare crimp terminal and the conductor OT terminal Heating the heat shrink tubing 1 Based on the cross sectional area of the cable conductor strip a part of insulation coating C to expose the conductor D of length L1 2 Put the heat shrink tubing onto the bare crimping termina...