18
Cable Connections
d
1
2
3
4
Insert the RJ-45 connector at one end of the network cable in an idle interface of the HUB.
Insert the RJ-45 connect at the other end of the network cable in the LAN interface on the RPC board.
Insert the RJ-45 connector at one end of the network cable in an idle interface of the HUB.
Insert the RJ-45 connect at the other end of the network cable in the COM interface on the SAP board in
the subrack.
SAP
Power cables of the RPC
frame
HUB
a
a
Содержание OptiX OSN 2500
Страница 1: ...HUAWEI TECHNOLOGIES CO LTD OptiX OSN 2500 Quick Installation Guide Issue 12 Date 2017 09 30 ...
Страница 19: ...16 Cable Connections c COA power interface F f cable a b a b COA power cable ...
Страница 36: ...33 Upward Cabling c Cable distribution plate To the alarm monitor SEI board ...
Страница 37: ...34 Downward cabling d Cable distribution plate SEI board To the alarm monitor a a ...