Figure 5-6
Securing the SUC into the cabinet
Step 3
Check the SUC to ensure that it has been properly installed and secured.
----End
5.7 Installing Adjustable Guide Rails for an SUD
Before assembling an SUD, you must install adjustable guide rails to bear it. With the adjustable
guide rails, an SUD can be placed into different depths of cabinets.
Prerequisites
The following tools and materials have been ready:
l
Phillips screwdriver (M3 to M6)
l
Marker pen
l
M6 screws
l
Square-hole positioning pins (matching square-hole channels)
l
Round-hole positioning pins (matching round-hole channels)
OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
5 N8500 Installation (with the S2600T Storage System as the
Storage Unit)
Issue 02 (2015-09-22)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
47