A
Preparing Load Cables
Context
The cables from the power distribution unit to the cabinet rPDU are not
prefabricated and need to be prepared onsite.
Procedure
Step 1 Prepare cables.
1. Strip a cable.
NO TE
The figure uses the single-phase scenario as an example. The required stripping length
in the three-phase scenario is the same as that in the single-phase scenario.
Figure A-1 Stripping a cable (unit: mm)
2. Crimp a cord end terminal.
Figure A-2 Crimping a cord end terminal
(1) Cord end terminal
(2) Cable
(3) Crimping tool
3. (Optional) For a three-core cable with a cross-sectional area of 6 mm
2
, wrap
the cable with two layers of heat shrink tubing and use a heat gun to heat-
shrink the tubing.
New Main Way 2.0
User Manual
A Preparing Load Cables
Issue 05 (2020-10-15)
Copyright © Huawei Technologies Co., Ltd.
73